West Coast Architectural Millwork
- Based in
- Redwood City
- On San Francisco permits
- Feb 2024 to Feb 2024
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2024 | Completed final sign-off Aug 2025 | 1032 Broadway | replace exterior doors in-kind to watch existing. 8 doors. proposed project consists of the replacement of non-historic, multilite wood doors with new multilite wood doors matching the material, configuration and operation of the (e) doors in the (e) openings at 5 locations at the south and west eleDetails
replace exterior doors in-kind to watch existing. 8 doors. proposed project consists of the replacement of non-historic, multilite wood doors with new multilite wood doors matching the material, configuration and operation of the (e) doors in the (e) openings at 5 locations at the south and west ele | $35,000 |