Permit GraphShortlistSan Francisco building permits since 2000

West Beam Construction Llc

Contractor license
1095115
State license record
Based in
San Francisco
On San Francisco permits
Apr 2023 to Jun 2026
Last 24 months
6 permits filed

21 permits since 2000: 20 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 4Stairs 3Kitchen remodel 4Bathroom remodel 3

3 bathroom remodel permits: 3 completed. Typically 4 days from filing to permit and 369 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 24, 2024Completed
final sign-off Jun 2025
330 San Leandro Wybathroom remodel inkind and convert toilet to floating tankless. bathroom remodel in kind and tub convert to free standing, kitchen remodel in kind. maintain 15" clear each side toilet and 24" in front. bath 1 approx. 82 sq ft. bath 2 approx. 35 sq ft. kitchen approx. 160 sq ft. no moving walls.
Details
Permit
202405242993
Status
complete
Filed
May 24, 2024
Permit issued
May 28, 2024
Final sign-off
Jun 3, 2025
Declared cost
$45,000
Address
330 San Leandro Wy

bathroom remodel inkind and convert toilet to floating tankless. bathroom remodel in kind and tub convert to free standing, kitchen remodel in kind. maintain 15" clear each side toilet and 24" in front. bath 1 approx. 82 sq ft. bath 2 approx. 35 sq ft. kitchen approx. 160 sq ft. no moving walls.

Open the permit page

$45,000
May 13, 2024Completed
final sign-off Sep 2024
1919 Octavia Stunit #4: demo on suite bath new deck style tub wain scott tile and the floor, toilet, sheet rock and paint. all fixtures same location.
Details
Permit
202405132013
Status
complete
Filed
May 13, 2024
Permit issued
May 13, 2024
Final sign-off
Sep 26, 2024
Declared cost
$24,000
Address
1919 Octavia St

unit #4: demo on suite bath new deck style tub wain scott tile and the floor, toilet, sheet rock and paint. all fixtures same location.

Open the permit page

$24,000
Jan 4, 2024Completed
final sign-off Aug 2025
1655 Folsom Stremodel (e) toilet and bath to (n) accessible toilet room. restoring back (e) mezzanine to original area (structural). demo (e) non load bearing partition and casework on ground floor.
Details
Permit
202401043411
Status
complete
Filed
Jan 4, 2024
Permit issued
Aug 8, 2024
Final sign-off
Aug 12, 2025
Declared cost
$125,000
Address
1655 Folsom St

remodel (e) toilet and bath to (n) accessible toilet room. restoring back (e) mezzanine to original area (structural). demo (e) non load bearing partition and casework on ground floor.

Open the permit page

$125,000