Wesco Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Dec 2025
- Last 24 months
- 6 permits filed
47 permits since 2000: 41 completed, 1 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 18 completed, 1 never finaled. Typically 1 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2025 | Completed final sign-off Mar 2026 | 351 Buena Vista East Av | unit #703, kitchen remodel in-kind and bathroom remodel replace tub with shower stall.Details
unit #703, kitchen remodel in-kind and bathroom remodel replace tub with shower stall. | $55,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 2507 Larkin St | remodel main bathroom in kind.Details
remodel main bathroom in kind. | $23,500 |
| Sep 6, 2024 | Completed final sign-off Sep 2024 | 77 Linda St | repair dry-rot bathroom floor & shower pan and replace in-kind located at top floor. no other work.Details
repair dry-rot bathroom floor & shower pan and replace in-kind located at top floor. no other work. | $3,500 |
| Jul 1, 2024 | Completed final sign-off Jan 2025 | 75 Linda St | interior remodel 1/l above garage: remodel of (e) bathroom. addition of 2nd bathroom. minor moving of bedroom wall. new recessed lights. no changes to g/l or 2/l. work to include new plumbing and electrical. no structural.Details
interior remodel 1/l above garage: remodel of (e) bathroom. addition of 2nd bathroom. minor moving of bedroom wall. new recessed lights. no changes to g/l or 2/l. work to include new plumbing and electrical. no structural. | $70,000 |
| Jul 2, 2021 | Completed final sign-off Feb 2022 | 1420 South Van Ness Av | bathroom anad add washer and dryer hook up. dryer shall comply with cmc 504.4 and 502.2.1. no new wall and no existing wall relocation new lighting shall comply with cec150.0(k)3 & (k)5.Details
bathroom anad add washer and dryer hook up. dryer shall comply with cmc 504.4 and 502.2.1. no new wall and no existing wall relocation new lighting shall comply with cec150.0(k)3 & (k)5. | $30,000 |
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 1515 16th Av | complete remodel of upper level (1) bathroom, remove shower stall and replace with tub/shower comboDetails
complete remodel of upper level (1) bathroom, remove shower stall and replace with tub/shower combo | $12,500 |
| Apr 12, 2019 | Completed final sign-off Oct 2021 | 54 Colby St | new master bedroom on lower level, remodel e bath, upper level remodel e bath and kitchenDetails
new master bedroom on lower level, remodel e bath, upper level remodel e bath and kitchen | $100,000 |
| Dec 27, 2018 | Completed final sign-off Jan 2020 | 201 Sansome St | #1004: 10th flr - half bath remodel, new cabinetry at entry, new lighting. 11th flr - renovate 2 baths, new cabinetry at study and master suite closet areaDetails
#1004: 10th flr - half bath remodel, new cabinetry at entry, new lighting. 11th flr - renovate 2 baths, new cabinetry at study and master suite closet area | $50,000 |
| Feb 20, 2018 | Completed final sign-off Jul 2018 | 524 03rd Av | convert (e) bathrooms to create 1 full bath and 1 3/4 bath. new flooring, new paint, new plm, new ele, new doors and new windowsDetails
convert (e) bathrooms to create 1 full bath and 1 3/4 bath. new flooring, new paint, new plm, new ele, new doors and new windows | $28,000 |
| Dec 20, 2017 | Completed final sign-off Jan 2021 | 719 Faxon Av | two-story 644 sf addition, new stair, kitchen & bath remodel.Details
two-story 644 sf addition, new stair, kitchen & bath remodel. | $175,000 |
| Nov 16, 2017 | Never finaled issued Jan 2018, no final | 175 Bluxome St | revision to app#201702219810. removing extg spiral staircase and replacing with new winder staircase. revised reflected ceiling plan in upstairs bedroom. no changes to exgt layout in upstairs bathroom. new finishes and fixtures only. n/a for maherDetails
revision to app#201702219810. removing extg spiral staircase and replacing with new winder staircase. revised reflected ceiling plan in upstairs bedroom. no changes to exgt layout in upstairs bathroom. new finishes and fixtures only. n/a for maher | |
| Feb 21, 2017 | Completed final sign-off Jul 2018 | 175 Bluxome St | #207- remodel 2 levels of existing live/work. remodel kitchen and bathrooms on 2nd and 3rd levels. no work visible from street. sprinkler and fire alarm under separate permit. no structural work. maher not reqDetails
#207- remodel 2 levels of existing live/work. remodel kitchen and bathrooms on 2nd and 3rd levels. no work visible from street. sprinkler and fire alarm under separate permit. no structural work. maher not req | $90,000 |
| May 5, 2016 | Completed final sign-off Sep 2016 | 2318 14th Av | bathroom remodel. reconfigure wall and bedroom closet.Details
bathroom remodel. reconfigure wall and bedroom closet. | $16,000 |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 11 Manor Dr | revision to appl #201411242301: reduction to the scope of work to eliminate lower level work includes work in existing bathroom, guest room & hallways.Details
revision to appl #201411242301: reduction to the scope of work to eliminate lower level work includes work in existing bathroom, guest room & hallways. | |
| Oct 14, 2015 | Completed final sign-off Jan 2016 | 6 Pinehurst Wy | 1/f- convert portion of garage to office & bathroom.Details
1/f- convert portion of garage to office & bathroom. | $28,414 |
| Jul 9, 2015 | Completed final sign-off Oct 2015 | 1225 Shrader St | remodel main bath. replace tub and tile, add two outlets and one surface mount light. all fixtures will remain in the same location.Details
remodel main bath. replace tub and tile, add two outlets and one surface mount light. all fixtures will remain in the same location. | $8,200 |
| Nov 24, 2014 | Completed final sign-off Feb 2016 | 11 Manor Dr | renovation of kitchen and 2 bathrooms and closet, new partitions, finishes, plumbing and electrical, new skylight and roof over master bathroom.Details
renovation of kitchen and 2 bathrooms and closet, new partitions, finishes, plumbing and electrical, new skylight and roof over master bathroom. | $60,000 |
| Aug 5, 2011 | Completed final sign-off Dec 2011 | 255 Topaz Wy | remodel kitchen and 2 bathrooms, add lighting and repl 5 windows and 2 patio doors, not visible from streetDetails
remodel kitchen and 2 bathrooms, add lighting and repl 5 windows and 2 patio doors, not visible from street | $30,000 |
| Feb 25, 2009 | Completed final sign-off Apr 2010 | 695 Grand View Av | work @ unit# 303 only. remodel kitchen & bathroom. remove & replace the same. all non structural.Details
work @ unit# 303 only. remodel kitchen & bathroom. remove & replace the same. all non structural. | $14,500 |