Back to bathroom remodel contractors
Wellbuilt Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Jun 2009 to Jul 2021
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2021 | Completed final sign-off Feb 2022 | 145 Presidio Av | interior alteration of 2 baths, replace wood burning fireplace with gas insert direct ventDetails
interior alteration of 2 baths, replace wood burning fireplace with gas insert direct vent | $65,000 |
| Jul 20, 2018 | Completed final sign-off Jan 2019 | 178 Eureka St | remodel kitchen & adjoining 1/2 bath, new plumbing, electrical, cabinets. no exterior work. no structural work. no work visible from st. kitchen sq ft 350 sqft, 1/2bath 50sq ft.Details
remodel kitchen & adjoining 1/2 bath, new plumbing, electrical, cabinets. no exterior work. no structural work. no work visible from st. kitchen sq ft 350 sqft, 1/2bath 50sq ft. | $60,000 |
| Oct 26, 2017 | Completed final sign-off Sep 2018 | 1750 Taylor St | #1702: exploratory demolition of all non-load bearing walls, remodeling of kitchen & 2 bathrooms, new electrical throughout. replacement of windows & (1) new door in existing openings, new fireplace insert., re-surfacing of balcony.Details
#1702: exploratory demolition of all non-load bearing walls, remodeling of kitchen & 2 bathrooms, new electrical throughout. replacement of windows & (1) new door in existing openings, new fireplace insert., re-surfacing of balcony. | $40,000 |
| Aug 2, 2017 | Expired or cancelled cancelled Dec 2017 | 300 Valley St | unit #2: remodel bathroom, e wtile, fixtures. upgrade electrical/lighting to current code. all work in kind. no structural or exterior work.Details
unit #2: remodel bathroom, e wtile, fixtures. upgrade electrical/lighting to current code. all work in kind. no structural or exterior work. | $35,000 |
| Jul 26, 2017 | Completed final sign-off Feb 2018 | 2322 Hyde St | kitchen remodel: replace cabinets, new countertops, upgrade elec to current code. bathroom (3): replace vanities x3, 1 powder room, new tub/shwoer master bathroom. no structura work. no exterior work.Details
kitchen remodel: replace cabinets, new countertops, upgrade elec to current code. bathroom (3): replace vanities x3, 1 powder room, new tub/shwoer master bathroom. no structura work. no exterior work. | $175,000 |
| Dec 1, 2016 | Completed final sign-off May 2017 | 1750 Taylor St | re-furb of apartment: new cabinets in kitchen, tile replaced in two bathrooms, vanities/bath replaced, floor refinished, patio door/windows replaced. fixtures and finishes only. no wall removal or modification. all work is non structural only.Details
re-furb of apartment: new cabinets in kitchen, tile replaced in two bathrooms, vanities/bath replaced, floor refinished, patio door/windows replaced. fixtures and finishes only. no wall removal or modification. all work is non structural only. | $150,000 |
| Jun 24, 2013 | Completed final sign-off Sep 2014 | 945 Green St | apt 3 - no structural or exterior work. replace and remodel interior - bathrooms, kitchen, bedrooms, upgrade lightings.Details
apt 3 - no structural or exterior work. replace and remodel interior - bathrooms, kitchen, bedrooms, upgrade lightings. | $500,000 |
| Nov 6, 2012 | Completed final sign-off Apr 2013 | 1170 Sacramento St | #7c: remodel 2 baths, new kitchen countertops, floor refurb, minor elec work paint. no structural work or exterior work.Details
#7c: remodel 2 baths, new kitchen countertops, floor refurb, minor elec work paint. no structural work or exterior work. | $100,000 |
| Jun 17, 2009 | Completed final sign-off Apr 2010 | 1170 Sacramento St | 19th floor (penthouse)-interior renovation including kitchen & 2 bathrooms, install new plumbing & electrical. new hardwood floors. buolding assocation to replace 1 (e) window in kind. no structural work to buildingDetails
19th floor (penthouse)-interior renovation including kitchen & 2 bathrooms, install new plumbing & electrical. new hardwood floors. buolding assocation to replace 1 (e) window in kind. no structural work to building | $150,000 |