Back to bathroom remodel contractors
Welco Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Mar 2011
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2011 | Completed final sign-off Jul 2011 | 85 Caine Av | add mud room, family room, bathroom & one storage on existing ground floor. add new bathroom & remodel kitchen on 2nd floor. add new deck & stair at rear. refinish front facade due to fire damaged & graffit to comply with complaint #201033722. replace windows with same size & location.Details
add mud room, family room, bathroom & one storage on existing ground floor. add new bathroom & remodel kitchen on 2nd floor. add new deck & stair at rear. refinish front facade due to fire damaged & graffit to comply with complaint #201033722. replace windows with same size & location. | $68,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 732 44th Av | to add one family room, two bedroom, two full bathroom, one storage & laundry area on (e) ground floor per plan. remodel (e) kitchen & two full bathroom on 2nd. floor per plan.Details
to add one family room, two bedroom, two full bathroom, one storage & laundry area on (e) ground floor per plan. remodel (e) kitchen & two full bathroom on 2nd. floor per plan. | $65,000 |
| Sep 23, 2009 | Completed final sign-off Oct 2009 | 2035 29th Av | remodel (e) bathroom include shower pan, tile, dougle sink, no adding walls or alterations of walls. retile flooor & walls. new new lighting & new exhaustDetails
remodel (e) bathroom include shower pan, tile, dougle sink, no adding walls or alterations of walls. retile flooor & walls. new new lighting & new exhaust | $5,700 |
| Nov 9, 2007 | Completed final sign-off May 2008 | 879 27th Av | to add one family room, two bedrooms, two full bathrooms, one storage and laundry room on existing ground floor per plan. convert existing sun room to full bath room on 2nd floor. replace existing front facade stucco in kind (400 sq. ft). replace front (e) windows in kind on 2nd floor.Details
to add one family room, two bedrooms, two full bathrooms, one storage and laundry room on existing ground floor per plan. convert existing sun room to full bath room on 2nd floor. replace existing front facade stucco in kind (400 sq. ft). replace front (e) windows in kind on 2nd floor. | $48,000 |