Webbe Jones Joinery
- Based in
- Berkeley
- On San Francisco permits
- Jul 2006 to Oct 2009
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2007 | Never finaled issued Jun 2007, no final | 123 Manchester St | replace less than 50% in kind, comply with nov# 200703115, rear stairs, lower landing, ground landing. replace front deck in kind, less than 30" above grade. replace aluminum windows at the rear (north side) of the building and sliding door.Details
replace less than 50% in kind, comply with nov# 200703115, rear stairs, lower landing, ground landing. replace front deck in kind, less than 30" above grade. replace aluminum windows at the rear (north side) of the building and sliding door. | $15,000 |