Waygreen Construction
- Based in
- Vallejo
- On San Francisco permits
- Feb 2007 to Feb 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2007 | Completed final sign-off Jul 2007 | 1934 Jefferson St | bath demo, new shower enclosure installed, toilet moved, new flooring, drywall, whirlpool tub, vanity. new ligthing, n bath window in e opening same widthDetails
bath demo, new shower enclosure installed, toilet moved, new flooring, drywall, whirlpool tub, vanity. new ligthing, n bath window in e opening same width | $10,000 |
| Feb 9, 2007 | Completed final sign-off Jun 2007 | 1901 09th Av | kitchen remodel-remove swinging door, replace with pocket door. replace (e) windows 2 with single window. replace in kind other window. 50% of wattage of lighting to be flourscent.Details
kitchen remodel-remove swinging door, replace with pocket door. replace (e) windows 2 with single window. replace in kind other window. 50% of wattage of lighting to be flourscent. | $10,500 |