Back to bathroom remodel contractors
Warne Renovation Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Jun 2023
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2023 | Completed final sign-off Nov 2023 | 3984 Sacramento St | in kind remodel of kitchen and hall bathroom. fixture location to remain the same, no plans. no structural demo.Details
in kind remodel of kitchen and hall bathroom. fixture location to remain the same, no plans. no structural demo. | $90,000 |
| Jan 19, 2023 | Completed final sign-off Jul 2023 | 250 Alhambra St | in kind remodel of 3rd floor bathroom. fixtures locations remain the same. replace (1) window in shower area. window not vsible from street.Details
in kind remodel of 3rd floor bathroom. fixtures locations remain the same. replace (1) window in shower area. window not vsible from street. | $40,000 |
| Sep 21, 2021 | Completed final sign-off Jan 2023 | 1055 California St | unit 10: in kind remodel of (1) kitchen, (2) bathrooms, (1) power room no change to layout. lighting shall comply with cec 150.0(k)Details
unit 10: in kind remodel of (1) kitchen, (2) bathrooms, (1) power room no change to layout. lighting shall comply with cec 150.0(k) | $100,000 |
| Jun 8, 2021 | Completed final sign-off Jan 2022 | 1000 Mason St | unit 101:in kind remodel of 1 kitchen 1 landry and 4 bathrooms, no change in layout of walls and openings.Details
unit 101:in kind remodel of 1 kitchen 1 landry and 4 bathrooms, no change in layout of walls and openings. | $135,000 |
| Dec 4, 2017 | Completed final sign-off Nov 2018 | 798 Stanyan St | unit #2: bathroom remodel move shower and bathtubDetails
unit #2: bathroom remodel move shower and bathtub | $17,500 |
| Apr 14, 2017 | Completed final sign-off Nov 2017 | 1750 Silliman St | partial garage conversion adding bedroom & bath. add 2nd story deck off kitchenDetails
partial garage conversion adding bedroom & bath. add 2nd story deck off kitchen | $43,000 |