Ward Cosntruction
- Based in
- Montana
- On San Francisco permits
- Sep 2007 to Aug 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2010 | Never finaled issued Aug 2010, no final | 29 Palm Av | remove & repl kitchen cabinets flooring counter tops; upgrade electrical sub panel & service upgrade, at least 50% high efficacy lighting (by wattage) no change to exhaust systemDetails
remove & repl kitchen cabinets flooring counter tops; upgrade electrical sub panel & service upgrade, at least 50% high efficacy lighting (by wattage) no change to exhaust system | $10,200 |
| Aug 6, 2010 | Expired or cancelled withdrawn Oct 2010 | 29 Palm Av | unit #2: remove & replace kitchen cabinets, repl flooring upgrade electrical, new lighting comply with cec 150(k)Details
unit #2: remove & replace kitchen cabinets, repl flooring upgrade electrical, new lighting comply with cec 150(k) | $10,200 |
| Feb 1, 2010 | Completed final sign-off May 2010 | 59 Brewster St | remodel kitchen - replace & upgrade cabients & all appliances. also install new flooring, appropriate electric & plumbing upgrades will also occur.Details
remodel kitchen - replace & upgrade cabients & all appliances. also install new flooring, appropriate electric & plumbing upgrades will also occur. | $8,000 |
| Jan 6, 2010 | Completed final sign-off May 2010 | 882 Potrero Av | kitchen & bath remodel @ ground level; 2-window replacement (not in bedrooms), 2-entry door replacement; one @ front & one @ back. paint entire unit, all interior, min 50% of kitchen light watts be in h.e. lights.Details
kitchen & bath remodel @ ground level; 2-window replacement (not in bedrooms), 2-entry door replacement; one @ front & one @ back. paint entire unit, all interior, min 50% of kitchen light watts be in h.e. lights. | $38,000 |
| Sep 13, 2007 | Completed final sign-off Feb 2008 | 1 San Marcos Av | remodel kitchen and 2 bathrooms. remove non-structural wall and construct a new wall back to its original location in master bedroom.Details
remodel kitchen and 2 bathrooms. remove non-structural wall and construct a new wall back to its original location in master bedroom. | $100,000 |