Back to bathroom remodel contractors
Wan Li Construction Co
- Based in
- Daly City
- On San Francisco permits
- Nov 2017 to Jun 2026
- Last 24 months
- 6 permits filed
28 permits since 2000: 25 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 12 completed, 1 in progress. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 1529 Mason St | add 2 bedroom, 1 bathroom adu under state adu program at (e) ground floor.Details
add 2 bedroom, 1 bathroom adu under state adu program at (e) ground floor. | $150,000 |
| Apr 15, 2026 | Completed final sign-off Jul 2026 | 1529 Mason St | all work under unit 1533 1st floor: add new laundry area at (e) bathroom and remove non load bearing stud at kitchen area. upgrade and provide headroom clearence at (e) landing for egress corridor. remodel kitchen/bathroom.Details
all work under unit 1533 1st floor: add new laundry area at (e) bathroom and remove non load bearing stud at kitchen area. upgrade and provide headroom clearence at (e) landing for egress corridor. remodel kitchen/bathroom. | $45,000 |
| Dec 2, 2024 | Completed final sign-off Jan 2025 | 1531 Mason St | remodel bath, redo existing shower pan, all in-kind.Details
remodel bath, redo existing shower pan, all in-kind. | $9,500 |
| Aug 23, 2024 | Completed final sign-off Oct 2024 | 408 Elizabeth St | bathroom remodel. relocate vanity, and re-built existing shower pan to curb-less shower pan. no notching of floor joist permitted.Details
bathroom remodel. relocate vanity, and re-built existing shower pan to curb-less shower pan. no notching of floor joist permitted. | $9,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2024 | 543 Buena Vista West Av | unit #: 5, remodel 1 kitchen (replace cabinets and counter top) remodel 1 bathroom (replace bath tubs, sink, tiles). all non structuralDetails
unit #: 5, remodel 1 kitchen (replace cabinets and counter top) remodel 1 bathroom (replace bath tubs, sink, tiles). all non structural | $18,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2024 | 543 Buena Vista West Av | unit #: 8, remodel 1 kitchen (replace cabinets and counter top) remodel 1 bathroom (replace bath tubs, sink, tiles).Details
unit #: 8, remodel 1 kitchen (replace cabinets and counter top) remodel 1 bathroom (replace bath tubs, sink, tiles). | $18,000 |
| Mar 24, 2023 | Completed final sign-off May 2024 | 465 Panorama Dr | at first floor, remodel (e) garden room to new bedroom and study, relocate (e) laundry and (n) bathroom; new furnace for 1/fDetails
at first floor, remodel (e) garden room to new bedroom and study, relocate (e) laundry and (n) bathroom; new furnace for 1/f | $38,750 |
| May 26, 2021 | Completed final sign-off Sep 2021 | 1740 Franklin St | unit# 4 - part of bathroom remodel, remove (e) bath tub, build one stand shower. replace bathroom light.Details
unit# 4 - part of bathroom remodel, remove (e) bath tub, build one stand shower. replace bathroom light. | $14,500 |
| Feb 9, 2021 | Completed final sign-off Mar 2021 | 1594 42nd Av | remodel partially one bath on upper level. remove (e) bathtub and build one stand shower. replace shower faucet. no change of toilet and sink on second floor.Details
remodel partially one bath on upper level. remove (e) bathtub and build one stand shower. replace shower faucet. no change of toilet and sink on second floor. | $6,500 |
| Nov 19, 2019 | Completed final sign-off Feb 2020 | 2640 Alemany Bl | remodel kitchen bathroom replace two front windows replace electrical panel windows at the front shall be wood interior with aluminum exterior. no alteration of walls. install new bath fan.Details
remodel kitchen bathroom replace two front windows replace electrical panel windows at the front shall be wood interior with aluminum exterior. no alteration of walls. install new bath fan. | $15,000 |
| Jun 13, 2018 | Completed final sign-off Jun 2019 | 106 Scotia Av | 1st flr - add new front door. 2nd flr - remodel kitchen and bath, add 1 full bath, infill south east lightwellDetails
1st flr - add new front door. 2nd flr - remodel kitchen and bath, add 1 full bath, infill south east lightwell | $40,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 4115 19th Av | revise the bath tub to stand shower, replace vanity and faucet. replace/vanity light and outlet, 1 switch. replace toiletDetails
revise the bath tub to stand shower, replace vanity and faucet. replace/vanity light and outlet, 1 switch. replace toilet | $12,000 |
| Nov 2, 2017 | Completed final sign-off May 2018 | 410 45th Av | remodel (1) bathroom on second floor, replace vanity, light, toilet, tile, rebuild shower. replace exhaust fan. no alteration of wall, windows and door.Details
remodel (1) bathroom on second floor, replace vanity, light, toilet, tile, rebuild shower. replace exhaust fan. no alteration of wall, windows and door. | $3,800 |