Back to bathroom remodel contractors
Walter Vidosh Construction Co
- Based in
- San Mateo
- On San Francisco permits
- Jul 2003 to Aug 2009
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2009 | Completed final sign-off Jan 2010 | 258 Jersey St | demo interior existing bathroom, remove around 200 sq ft wall area of surface lath & plaster. then install rough elec-plugs, insulation, drywall, painting, new fixtures, remodel unit #1. 5/8 type x typ bd fypical (no structural work).Details
demo interior existing bathroom, remove around 200 sq ft wall area of surface lath & plaster. then install rough elec-plugs, insulation, drywall, painting, new fixtures, remodel unit #1. 5/8 type x typ bd fypical (no structural work). | $30,000 |