Back to bathroom remodel contractors
Walsh Construction
- Based in
- Costa Mesa
- On San Francisco permits
- Sep 2014 to Jun 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2015 | Completed final sign-off Sep 2016 | 15 Gladeview Wy | remove non-bearing wall @ entry, add new skylight, replace enty door, build out exisitng lower level with new family room, laundry room & bath. replace (e) door to rear yard with new french door. replace (e) rear yard window with sliding french door.Details
remove non-bearing wall @ entry, add new skylight, replace enty door, build out exisitng lower level with new family room, laundry room & bath. replace (e) door to rear yard with new french door. replace (e) rear yard window with sliding french door. | $57,400 |
| Oct 29, 2014 | Completed final sign-off Apr 2015 | 957 Grove St | revision to extg bathroom permit #201409247229. repair and replace extg bathroom flooring. repair and replace damaged rear wall at bathroomDetails
revision to extg bathroom permit #201409247229. repair and replace extg bathroom flooring. repair and replace damaged rear wall at bathroom | $5,000 |
| Oct 1, 2014 | Completed final sign-off Apr 2015 | 71 Garcia Av | replacement of existing tub, ink, fain, lighting fixtures, medicine cabinet, drywall, tile in existing bathDetails
replacement of existing tub, ink, fain, lighting fixtures, medicine cabinet, drywall, tile in existing bath | $15,000 |
| Sep 24, 2014 | Completed final sign-off Apr 2015 | 957 Grove St | remodel of (e) bathroom #2. work in unit 957 grove stret. replace fixtures and finsihes.Details
remodel of (e) bathroom #2. work in unit 957 grove stret. replace fixtures and finsihes. | $15,000 |