Wall Construction
- Based in
- Oakland
- On San Francisco permits
- Aug 2000 to Feb 2016
- Last 24 months
- 0 permits filed
41 permits since 2000: 28 completed, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 144 days from filing to permit and 339 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2014 | Completed final sign-off Apr 2015 | 433 Collingwood St | replacement of existing siding and stucco, repair decks, reflashing windowsDetails
replacement of existing siding and stucco, repair decks, reflashing windows | $573,000 |
| Mar 7, 2014 | Completed final sign-off Feb 2016 | 146 Staples Av | addition to provide new master suite(lower level). extension of living space (upper level). demolition and framing of walls. form 2 new bathrooms. form new deck off living space upper level. new interinal stair to connect upper lower levels.Details
addition to provide new master suite(lower level). extension of living space (upper level). demolition and framing of walls. form 2 new bathrooms. form new deck off living space upper level. new interinal stair to connect upper lower levels. | $211,852 |
| Jun 3, 2011 | Completed final sign-off Mar 2016 | 18 Valley St | remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor.Details
remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor. | $27,500 |
| Dec 1, 2003 | Completed final sign-off Feb 2004 | 145 Stanyan St | remove 2 french doors, hot mop 8x3 deck surface. install same french doors, repair any siding & trimDetails
remove 2 french doors, hot mop 8x3 deck surface. install same french doors, repair any siding & trim | $6,000 |