Permit GraphShortlistSan Francisco building permits since 2000

Wai On Liu

Contractor license
710419
State license record
Based in
Daly Ycity
On San Francisco permits
Apr 2003 to Nov 2023
Last 24 months
0 permits filed

10 permits since 2000: 8 completed, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Kitchen remodel 4Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 46 days from filing to permit and 743 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 5, 2022Completed
final sign-off Oct 2024
156 Raymond Avremodel downstairs. convert lower level into (3) bedrooms and (2) bathrooms. no structural change. keep original load bearing wall and columns. any structural changes must consult with licensed structural engineer. relocate existing water heater.
Details
Permit
202207057715
Status
complete
Filed
Jul 5, 2022
Permit issued
Sep 30, 2022
Final sign-off
Oct 28, 2024
Declared cost
$50,000
Address
156 Raymond Av

remodel downstairs. convert lower level into (3) bedrooms and (2) bathrooms. no structural change. keep original load bearing wall and columns. any structural changes must consult with licensed structural engineer. relocate existing water heater.

Open the permit page

$50,000
Jan 20, 2022Completed
final sign-off Jan 2024
343 Walnut Stapt #4 & #6 (3rd & 4th fl): identical interior remodeling work. combine separate washroom & bathroom into 1 single bathroom in same location. combine kitchen & utility room into 1 large kitchen.
Details
Permit
202201206286
Status
complete
Filed
Jan 20, 2022
Permit issued
Jan 26, 2022
Final sign-off
Jan 23, 2024
Declared cost
$50,000
Address
343 Walnut St

apt #4 & #6 (3rd & 4th fl): identical interior remodeling work. combine separate washroom & bathroom into 1 single bathroom in same location. combine kitchen & utility room into 1 large kitchen.

Open the permit page

$50,000