Back to bathroom remodel contractors
Wah Wong Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Apr 2017
- Last 24 months
- 0 permits filed
107 permits since 2000: 97 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
44 bathroom remodel permits: 43 completed, 1 never finaled. Typically 1 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2017 | Completed final sign-off May 2017 | 1931 15th St | #1931- bathroom remodel, remove & replace bathroom walls & tiles.Details
#1931- bathroom remodel, remove & replace bathroom walls & tiles. | $4,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 1534 31st Av | remodel kitchen & 2 baths, upgrade electrical on main floorDetails
remodel kitchen & 2 baths, upgrade electrical on main floor | $30,000 |
| Mar 11, 2016 | Completed final sign-off Dec 2016 | 1014 Capitol Av | construct 1 new bath, 2 new bedrooms, new bar skink storage on 1st f, remodel kitchen, bath, dining rm 2nd fl. remodel bath 3rd fl, new less than 10 ft high deck at yard, replace e footing,water heater furnace.repair dry rot front stairDetails
construct 1 new bath, 2 new bedrooms, new bar skink storage on 1st f, remodel kitchen, bath, dining rm 2nd fl. remodel bath 3rd fl, new less than 10 ft high deck at yard, replace e footing,water heater furnace.repair dry rot front stair | $80,000 |
| Mar 11, 2016 | Completed final sign-off Sep 2016 | 1534 31st Av | construct 3 new baths, 2 bedrooms, den on gr fl. new less than 10 ft high deck at rear yard. relocate water heater and furnaceDetails
construct 3 new baths, 2 bedrooms, den on gr fl. new less than 10 ft high deck at rear yard. relocate water heater and furnace | $65,000 |
| Jan 15, 2016 | Completed final sign-off May 2016 | 2222 36th Av | construct two bedroom, one full bathroom, laundry & storage area, all work at ground floor.Details
construct two bedroom, one full bathroom, laundry & storage area, all work at ground floor. | $52,000 |
| Aug 31, 2015 | Completed final sign-off Aug 2016 | 638 42nd Av | remodel kitchen and a bathroom, add new full bathroom. convert bedroom to media rm, install new lights on 2nd flr. add 2 bedrooms, a media rm, a new full bathroom. convert entry way to a new foyer on 1st flr. relocate laundry. replace furnace & whDetails
remodel kitchen and a bathroom, add new full bathroom. convert bedroom to media rm, install new lights on 2nd flr. add 2 bedrooms, a media rm, a new full bathroom. convert entry way to a new foyer on 1st flr. relocate laundry. replace furnace & wh | $110,000 |
| Mar 18, 2015 | Completed final sign-off Jan 2016 | 175 Grand View Av | install tiles @ the ground floor existing master bed room floor and the bathroom. (floor, wall and shower always to ceiling)Details
install tiles @ the ground floor existing master bed room floor and the bathroom. (floor, wall and shower always to ceiling) | $3,000 |
| Feb 9, 2015 | Completed final sign-off Apr 2016 | 176 Yerba Buena Av | 1/f- add 1 family room, 1 gym, sauna room, laundry room, media room and full bath. 2/f- remodel kitchen and 1/2 bath. 3/f- remodel 2 bathroom and add 1 full bath. replace all windows with fiberglass casement windows in (e) openings. no expansion of existing building foot print.Details
1/f- add 1 family room, 1 gym, sauna room, laundry room, media room and full bath. 2/f- remodel kitchen and 1/2 bath. 3/f- remodel 2 bathroom and add 1 full bath. replace all windows with fiberglass casement windows in (e) openings. no expansion of existing building foot print. | $130,000 |
| Aug 14, 2014 | Completed final sign-off Nov 2014 | 1356 Baker St | legalize 1st floor bathroom & bedroom. remodel kitchen & 1 bathroom, add 1 bathroom, replace 6 front/side exisitng windows in-kind with wood casement windows with existing, transome to remain.Details
legalize 1st floor bathroom & bedroom. remodel kitchen & 1 bathroom, add 1 bathroom, replace 6 front/side exisitng windows in-kind with wood casement windows with existing, transome to remain. | $30,000 |
| Aug 7, 2014 | Completed final sign-off Nov 2014 | 587 Sawyer St | 1st fl: add 1 media room, 1 laundry, 1 full bath, storage. legalize/install. 2nd fl: relocate kitchen to front and convert kitchen to bedroom; remove existing porch at rear installed without permit, 1st flr build raise floor.Details
1st fl: add 1 media room, 1 laundry, 1 full bath, storage. legalize/install. 2nd fl: relocate kitchen to front and convert kitchen to bedroom; remove existing porch at rear installed without permit, 1st flr build raise floor. | $50,000 |
| Jun 12, 2014 | Completed final sign-off Jul 2015 | 4035 18th St | revised to approval pa #2008-0519-2371, relocated ada bathroom, shorten building 5 ft from property line, all other details not change follow by approved plan 200805192371, structural change to revised proposed spread foundation to retaining wall foundation per plan in order not to underpin adjacentDetails
revised to approval pa #2008-0519-2371, relocated ada bathroom, shorten building 5 ft from property line, all other details not change follow by approved plan 200805192371, structural change to revised proposed spread foundation to retaining wall foundation per plan in order not to underpin adjacent | |
| Nov 8, 2013 | Completed final sign-off Feb 2015 | 163 Westgate Dr | basement foundation repair & replace, replace new furnace & heater, replace concrete slab, add one new bath at basement.Details
basement foundation repair & replace, replace new furnace & heater, replace concrete slab, add one new bath at basement. | $60,000 |
| Nov 6, 2013 | Completed final sign-off Aug 2015 | 826 37th Av | 1)enclose rear pop out on ground floor. 2)new bathroom and exercise room at ground floor.Details
1)enclose rear pop out on ground floor. 2)new bathroom and exercise room at ground floor. | $35,000 |
| Jul 18, 2013 | Completed final sign-off Oct 2013 | 563 18th Av | rev. to pa#201305146810: relocate door at bathroom on g/f & remodel, new stairs to 2/f and remove non-bearing wall @ 2/f, removal of wall @ (e) kitchen, remodel kitchen @ 2/f.Details
rev. to pa#201305146810: relocate door at bathroom on g/f & remodel, new stairs to 2/f and remove non-bearing wall @ 2/f, removal of wall @ (e) kitchen, remodel kitchen @ 2/f. | $20,000 |
| May 14, 2013 | Completed final sign-off Oct 2013 | 563 18th Av | remodel (e) kitchen, remove/relocate 2 bathrooms at 2nd floor & construct new staircase from 2nd floor to ground floor. re-arrange (e) bedoorm, 1 bathroom, family room at the ground floorDetails
remodel (e) kitchen, remove/relocate 2 bathrooms at 2nd floor & construct new staircase from 2nd floor to ground floor. re-arrange (e) bedoorm, 1 bathroom, family room at the ground floor | $65,000 |
| Jan 23, 2013 | Completed final sign-off Mar 2013 | 139 Arch St | remodel ground floor:add family room and one full bath.Details
remodel ground floor:add family room and one full bath. | $50,000 |
| Nov 27, 2012 | Completed final sign-off Mar 2016 | 1624 Alabama St | interior remodel & rear horizontal addition on 1st, 2nd & 3rd levels. add one bath. partial vertical addition at third level.Details
interior remodel & rear horizontal addition on 1st, 2nd & 3rd levels. add one bath. partial vertical addition at third level. | $285,000 |
| Jun 18, 2012 | Completed final sign-off Sep 2012 | 1914 Balboa St | lower unit only- replace kitchen cabinet and tiles floor, put tiles in bathroom, new sheetrock at kitchen and 3 bedrooms ceiling.Details
lower unit only- replace kitchen cabinet and tiles floor, put tiles in bathroom, new sheetrock at kitchen and 3 bedrooms ceiling. | $6,800 |
| Mar 23, 2012 | Completed final sign-off May 2012 | 439 27th Av | remodel existing kitchen and bath in the same location.Details
remodel existing kitchen and bath in the same location. | $16,000 |
| Mar 12, 2012 | Completed final sign-off Aug 2012 | 1797 Oakdale Av | at 1st floor, convert e closet to full bathroom. replace extg window in kind.Details
at 1st floor, convert e closet to full bathroom. replace extg window in kind. | $5,000 |
| Jan 5, 2012 | Completed final sign-off Apr 2012 | 139 Byxbee St | remodel 1st floor: add storage room & 1/2 bath. remodel basement: add family, bedroom & 1/2 bath.Details
remodel 1st floor: add storage room & 1/2 bath. remodel basement: add family, bedroom & 1/2 bath. | $40,000 |
| Sep 8, 2011 | Completed final sign-off Feb 2012 | 1570 Van Dyke Av | remodel ground floor to have 2 bedrooms, full bath, 2 storage rooms, and family room. install gas furnace, water heater, laundry in garageDetails
remodel ground floor to have 2 bedrooms, full bath, 2 storage rooms, and family room. install gas furnace, water heater, laundry in garage | $51,000 |
| Jun 24, 2011 | Completed final sign-off Aug 2011 | 439 23rd Av | remodel (e) kitchen and (e) 1-1/2 baths at second floor. no structural work. new lighting comply with cec 150(k). provide carbon monoxide detector per sec 420 of cbc. replace two windows in kind in the kitchen.Details
remodel (e) kitchen and (e) 1-1/2 baths at second floor. no structural work. new lighting comply with cec 150(k). provide carbon monoxide detector per sec 420 of cbc. replace two windows in kind in the kitchen. | $22,000 |
| May 24, 2011 | Completed final sign-off Sep 2011 | 754 45th Av | two new bedrooms, one half bath room, storage room to be constructed at ground floor.Details
two new bedrooms, one half bath room, storage room to be constructed at ground floor. | $40,000 |
| Mar 15, 2011 | Completed final sign-off Oct 2011 | 2346 35th Av | remodel (e) kitchen, bath and add one (n) fullbath, (n)study nook on 2nd fl. constructtwo (n) bedrooms, one fullbath and a fam room on ground fl, construct one (n) rear deck and stairs.Details
remodel (e) kitchen, bath and add one (n) fullbath, (n)study nook on 2nd fl. constructtwo (n) bedrooms, one fullbath and a fam room on ground fl, construct one (n) rear deck and stairs. | $60,000 |
| Feb 11, 2011 | Completed final sign-off Jul 2011 | 1470 De Haro St | 2nd floor- construction non-bearing walls for new bathroom & modify (e) bathroom.Details
2nd floor- construction non-bearing walls for new bathroom & modify (e) bathroom. | $15,000 |
| Dec 20, 2010 | Completed final sign-off Mar 2011 | 1032 Noriega St | to remodel ground floor. add family room, full bathroom, bedroom and storage room. to comply with nov 201082791. no work done on 2hd floor.Details
to remodel ground floor. add family room, full bathroom, bedroom and storage room. to comply with nov 201082791. no work done on 2hd floor. | $35,000 |
| May 7, 2010 | Completed final sign-off Oct 2010 | 762 Cayuga Av | construct 2 new bedroom, 1 half bathroom & 1 full bathroom. remodel (e) bedroom on ground floor. replace (e) water heater & furnaceDetails
construct 2 new bedroom, 1 half bathroom & 1 full bathroom. remodel (e) bedroom on ground floor. replace (e) water heater & furnace | $45,000 |
| Oct 29, 2009 | Completed final sign-off Jun 2010 | 2840 Greenwich St | rear building, unit 2840: interior remodel of apt unit on the 2nd floor of existing 2 unit building. remodel includes converting e study to a bedroom. add bath with a shower. necessary demo and construction .Details
rear building, unit 2840: interior remodel of apt unit on the 2nd floor of existing 2 unit building. remodel includes converting e study to a bedroom. add bath with a shower. necessary demo and construction . | $35,000 |
| Apr 3, 2008 | Completed final sign-off Jul 2008 | 31 Margaret Av | remodel (e) kitchen and bathroom at 2nd floor and add one new bathroom. add 2 bedrooms, storage and half bath at ground floor. construct new ground deck at the back under 30 inches.Details
remodel (e) kitchen and bathroom at 2nd floor and add one new bathroom. add 2 bedrooms, storage and half bath at ground floor. construct new ground deck at the back under 30 inches. | $65,000 |
| Oct 5, 2007 | Completed final sign-off Jan 2008 | 2155 33rd Av | remodel ground floor for (n) two bedrooms, one full bath and storage room.Details
remodel ground floor for (n) two bedrooms, one full bath and storage room. | $39,000 |
| Oct 4, 2007 | Completed final sign-off Jun 2008 | 665 Goettingen St | remodel 2/f kitchen, convert (e) bath & closet into one & 1/2 bath, convert portion (e) kitchen into a study room, add rooms at g/f, add a rear deck.Details
remodel 2/f kitchen, convert (e) bath & closet into one & 1/2 bath, convert portion (e) kitchen into a study room, add rooms at g/f, add a rear deck. | $30,000 |
| Aug 24, 2007 | Completed final sign-off Dec 2007 | 1932 Cabrillo St | remodel garage to have laundry room, half bath and storage room and replace ceiling.Details
remodel garage to have laundry room, half bath and storage room and replace ceiling. | $25,000 |
| Jul 3, 2007 | Completed final sign-off Jun 2008 | 1480 36th Av | 1. replacement of (e) foundation 2. remodeling of (e) family room, bathroom and add 1/2 bath & laundry room on 1st floor/add bedroom 3. remodeling of (e)bathroom on 2nd floor.Details
1. replacement of (e) foundation 2. remodeling of (e) family room, bathroom and add 1/2 bath & laundry room on 1st floor/add bedroom 3. remodeling of (e)bathroom on 2nd floor. | $60,000 |
| Mar 27, 2007 | Completed final sign-off Aug 2007 | 33 Elsie St | kitchen and bath remodel to comply with 200794695. repair termite damage at dining room and kitchen and bath. refinish hardwood floor,paint inside and out. all work in lower unitDetails
kitchen and bath remodel to comply with 200794695. repair termite damage at dining room and kitchen and bath. refinish hardwood floor,paint inside and out. all work in lower unit | $46,000 |
| Jan 9, 2007 | Completed final sign-off Aug 2007 | 491 10th Av | remodel 4 kitchens and 4 bathrooms. remove walls and replace with beams. add 4 windows, 2 visible from street.Details
remodel 4 kitchens and 4 bathrooms. remove walls and replace with beams. add 4 windows, 2 visible from street. | $45,000 |
| Jan 5, 2007 | Completed final sign-off Sep 2008 | 2422 Rivera St | remodel 2nd floor kitchen, a new bedroom and a new bathroom, a family room on 1st floor.Details
remodel 2nd floor kitchen, a new bedroom and a new bathroom, a family room on 1st floor. | $30,000 |
| Sep 20, 2006 | Completed final sign-off Jun 2007 | 2641 Hyde St | 2641 hyde st: update 2 bathrms, change tiles,bathtub & shower pan,2 sinks,2 toilets & windows, change/replace 5 interior doors & 2 closet doors, add 2 (n) gfci outlets in bathrms. 2643 hyde st: update 2 bathrms,change tiles, bath tub & shower pan,2 sinks,2 toilets & 2 windows, change/replace 6 interDetails
2641 hyde st: update 2 bathrms, change tiles,bathtub & shower pan,2 sinks,2 toilets & windows, change/replace 5 interior doors & 2 closet doors, add 2 (n) gfci outlets in bathrms. 2643 hyde st: update 2 bathrms,change tiles, bath tub & shower pan,2 sinks,2 toilets & 2 windows, change/replace 6 inter | $19,000 |
| Jan 30, 2006 | Completed final sign-off Nov 2007 | 240 Paris St | new 2 story rear addition: 1/f- 2 bedrooms, 2 full bath & computer room. 2/f- 2 bedrooms & 2 full baths.Details
new 2 story rear addition: 1/f- 2 bedrooms, 2 full bath & computer room. 2/f- 2 bedrooms & 2 full baths. | $80,000 |
| May 12, 2003 | Completed final sign-off Aug 2003 | 768 26th Av | remodel (e) kitchen, bath and toilet and add one bath at third flrDetails
remodel (e) kitchen, bath and toilet and add one bath at third flr | $40,000 |
| May 16, 2002 | Completed final sign-off Aug 2002 | 1152 Potrero Av | remodel (e) kichen & (e) bath on 2nd flr. (main flr) no wall changesDetails
remodel (e) kichen & (e) bath on 2nd flr. (main flr) no wall changes | $12,000 |
| Jun 27, 2001 | Completed final sign-off Oct 2001 | 1860 22nd Av | kitchen & bath remodeling,repl (e)windows in kindDetails
kitchen & bath remodeling,repl (e)windows in kind | $10,000 |
| Feb 1, 2001 | Completed final sign-off Apr 2001 | 208 02nd Av | add 2 storage room, 1 guest room & half bath at g/floorDetails
add 2 storage room, 1 guest room & half bath at g/floor | $8,000 |
| Jan 2, 2001 | Completed final sign-off Apr 2001 | 467 18th Av | remodel kitchen and 1 bath 2nd floor replace celsex for the wall and ceiling 2nd floorDetails
remodel kitchen and 1 bath 2nd floor replace celsex for the wall and ceiling 2nd floor | $12,000 |