W Y Developer Inc.
- Based in
- Redwqood City
- On San Francisco permits
- Oct 2016 to Aug 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 8 days from filing to permit and 376 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2017 | Completed final sign-off Mar 2018 | 506 Eureka St | legalize one bedroom, construct family room & laundry at g/f, remodel (e) kitchen, construct new 1/2 bath & rewire electrical lighting at 2/f, construct 1 new bathroom at 3/f, remove partial (e) foundation, replace with new foundation & new post at g/f. replace 1 window, alumi. to wood ceder on g/fDetails
legalize one bedroom, construct family room & laundry at g/f, remodel (e) kitchen, construct new 1/2 bath & rewire electrical lighting at 2/f, construct 1 new bathroom at 3/f, remove partial (e) foundation, replace with new foundation & new post at g/f. replace 1 window, alumi. to wood ceder on g/f | $68,000 |
| Dec 2, 2016 | Completed final sign-off Jan 2018 | 3136 Anza St | per unit legalization ordinance 43-14, legalization of unit installed without permit, legalize kitchen, one bed rm & one bath rm. all work at ground floor.(no.3136 anza street on ground floor)Details
per unit legalization ordinance 43-14, legalization of unit installed without permit, legalize kitchen, one bed rm & one bath rm. all work at ground floor.(no.3136 anza street on ground floor) | $56,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2018 | 3138 Anza St | revision to 201611102418: relocate (e) kitchen. construct one new full bath rm & convert (e) kitchen to bed rm at 2nd flrDetails
revision to 201611102418: relocate (e) kitchen. construct one new full bath rm & convert (e) kitchen to bed rm at 2nd flr | $12,000 |
| Nov 10, 2016 | Completed final sign-off Mar 2018 | 3138 Anza St | remodel (e) kitchen, (e) bath on 2nd & 3rd flr. no removal of walls. replace water lines w/ copper pipings, replace sewer drain pipes within the bldg. replace furnace in same location at garage. upgrade elec panels, replace gas lings. move gas meter from (e) foyer to garage. replace (e) water heaterDetails
remodel (e) kitchen, (e) bath on 2nd & 3rd flr. no removal of walls. replace water lines w/ copper pipings, replace sewer drain pipes within the bldg. replace furnace in same location at garage. upgrade elec panels, replace gas lings. move gas meter from (e) foyer to garage. replace (e) water heater | $30,000 |