Back to bathroom remodel contractors
W.K. Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2014
- Last 24 months
- 0 permits filed
86 permits since 2000: 61 completed, 17 never finaled, 8 expired or cancelled.
Of the 17 never-finaled permits, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 9 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2013 | Completed final sign-off Nov 2013 | 2800 Santiago St | 1st floor alteration to convert (e) family room & garage space to family room, bedroom & a full bathroom. new furnace & water heater, dryrot repair at various location.Details
1st floor alteration to convert (e) family room & garage space to family room, bedroom & a full bathroom. new furnace & water heater, dryrot repair at various location. | $35,000 |
| Jan 20, 2011 | Completed final sign-off Jul 2011 | 2739 Webster St | remodeling kitchen, replace hood, sink, faucet, cabinet, countertop and lighting. replace back window - milgard white vinyl. not visible from street. remodeling two bathrooms, replace tile, sink, faucet, toilet, light, tub, shower pan. interior painting. no change to walls or doors.Details
remodeling kitchen, replace hood, sink, faucet, cabinet, countertop and lighting. replace back window - milgard white vinyl. not visible from street. remodeling two bathrooms, replace tile, sink, faucet, toilet, light, tub, shower pan. interior painting. no change to walls or doors. | $25,000 |
| Nov 4, 2009 | Never finaled issued Nov 2009, no final | 468 Mississippi St | revision to appl #200910058274: relocate bathroom door, remove shelves, remove sink, cabinet & closet at grade level.Details
revision to appl #200910058274: relocate bathroom door, remove shelves, remove sink, cabinet & closet at grade level. | |
| Jan 8, 2007 | Completed final sign-off Apr 2007 | 2737 Webster St | remodel kitchen- replace cabinet, sink, stove, lighting. 1 bathroom remodel- replace tile, shower pan, faucet, toilet, lighting and painting. non structural.Details
remodel kitchen- replace cabinet, sink, stove, lighting. 1 bathroom remodel- replace tile, shower pan, faucet, toilet, lighting and painting. non structural. | $22,000 |
| Oct 20, 2006 | Completed final sign-off Dec 2006 | 2939 Fillmore St | remodeling bathroom. replace tub. sink, toilet, faucet & lighting & painting. tile. flourescent lighting.Details
remodeling bathroom. replace tub. sink, toilet, faucet & lighting & painting. tile. flourescent lighting. | $12,500 |
| Sep 11, 2006 | Completed final sign-off Nov 2006 | 128 Scott St | remodeling bathroom, replace sink, toilet, shower and faucet. install new tile, lighting and painting.Details
remodeling bathroom, replace sink, toilet, shower and faucet. install new tile, lighting and painting. | $6,800 |
| Sep 11, 2006 | Completed final sign-off Nov 2006 | 130 Scott St | remodeling bathroom, replace sink, toilet, shower and faucet. install tile, light and painting.Details
remodeling bathroom, replace sink, toilet, shower and faucet. install tile, light and painting. | $7,200 |
| Jan 6, 2006 | Never finaled issued Jan 2006, no final | 1049 Dolores St | revise & renew appl#200407279949 kitchen,hallway,bathroom remodel.additional work-remove kitchen counter,remove 1 skylight at kitchen,enlarge 1 remaining.add 2 more skylights at hallway(total 1),enlarge 2 remaining (total 4),eliminate skylight at bathroom in its entiretyDetails
revise & renew appl#200407279949 kitchen,hallway,bathroom remodel.additional work-remove kitchen counter,remove 1 skylight at kitchen,enlarge 1 remaining.add 2 more skylights at hallway(total 1),enlarge 2 remaining (total 4),eliminate skylight at bathroom in its entirety | $10,000 |
| Jul 27, 2004 | Never finaled issued Jul 2004, no final | 1049 Dolores St | remodel (e) entry hallway, kitchen and bathroom for unit 4.Details
remodel (e) entry hallway, kitchen and bathroom for unit 4. | $51,000 |
| Aug 7, 2001 | Completed final sign-off Nov 2001 | 1049 Dolores St | replace bathroom tile, faucet, sink & toilet in apt. #1, 2 & 3Details
replace bathroom tile, faucet, sink & toilet in apt. #1, 2 & 3 | $8,000 |
| Jan 8, 2001 | Completed final sign-off May 2001 | 1760 Pacific Av | replace tile. shower pan. and fauset in the master bathroom. all work in apt#2. no structural workDetails
replace tile. shower pan. and fauset in the master bathroom. all work in apt#2. no structural work | $8,000 |
| Oct 11, 2000 | Expired or cancelled expired Feb 2001 | 2999 26th Av | remodel master bathroom,replace tile, bath tub,sink,toilet & faucet.Details
remodel master bathroom,replace tile, bath tub,sink,toilet & faucet. | $4,800 |
| Jun 21, 2000 | Expired or cancelled expired Jun 2001 | 110 Aloha Av | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $33,000 |
| Feb 25, 2000 | Completed final sign-off Apr 2000 | 1774 35th Av | remodel bathroom, replace fixtures, tile onlyDetails
remodel bathroom, replace fixtures, tile only |