Vt Construction And Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Nov 2016 to Sep 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 10 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 377 days from filing to permit and 581 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1310 Alabama St | remodel (e) & add (n)bedroom,bath & adu(ca).voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate and replace in-kind. door being replaced and metal gate added.ab112Details
remodel (e) & add (n)bedroom,bath & adu(ca).voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate and replace in-kind. door being replaced and metal gate added.ab112 | $300,000 |
| Jun 29, 2026 | Completed final sign-off Aug 2026 | 4123 Ulloa St | bathroom remodel in-kind, replacing tile, toilet, vanity, light fixture. approx 40 sq ft. remodeling in kind.Details
bathroom remodel in-kind, replacing tile, toilet, vanity, light fixture. approx 40 sq ft. remodeling in kind. | $5,000 |
| Jul 18, 2025 | Completed final sign-off Jul 2026 | 519 Capp St | interior remodel including (n) kitchen w/(n) hood in each unit; bathroom remodel in each unit/ (n) 1/2 bath on lower floor. remove (e) unpermitted sunrooms & convert back to rear porch; add concrete foundation & concrete slab while lowering floor elevation to crawl spaceDetails
interior remodel including (n) kitchen w/(n) hood in each unit; bathroom remodel in each unit/ (n) 1/2 bath on lower floor. remove (e) unpermitted sunrooms & convert back to rear porch; add concrete foundation & concrete slab while lowering floor elevation to crawl space | $450,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2023 | 180 Granada Av | horizontal addition at rear yard. 1st flr: remodel garage & add (n) bathroom. 2nd flr: remodel kitchen & convert (e) bedroom into dining rm, add (n) famiy rm, deck,& laundry. update mep.Details
horizontal addition at rear yard. 1st flr: remodel garage & add (n) bathroom. 2nd flr: remodel kitchen & convert (e) bedroom into dining rm, add (n) famiy rm, deck,& laundry. update mep. | $200,000 |
| Nov 4, 2016 | Completed final sign-off Apr 2021 | 3190 San Bruno Av | convert (6) covered parking spaces into (2) new accessory dwelling units per ord# 162-16. renovate unit #11, convert into (2) bed, (1)bath layout. reference pa# 201511303764 for soft story retrofit. ** maher: n/a **Details
convert (6) covered parking spaces into (2) new accessory dwelling units per ord# 162-16. renovate unit #11, convert into (2) bed, (1)bath layout. reference pa# 201511303764 for soft story retrofit. ** maher: n/a ** | $75,000 |