Back to bathroom remodel contractors
Vonnegut Thoreau Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Oct 2012
- Last 24 months
- 0 permits filed
27 permits since 2000: 25 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2012 | Completed final sign-off Mar 2012 | 180 Landers St | #1: replace vanity, toilet, shower fixtures, tile & sconces in bathroom. add gfci outlet, install new mirrors & medicine cabinet, storage & shelving. plumbing to remain in (e) locations. re-paint all walls & ceiling. not moving or adding any wallsDetails
#1: replace vanity, toilet, shower fixtures, tile & sconces in bathroom. add gfci outlet, install new mirrors & medicine cabinet, storage & shelving. plumbing to remain in (e) locations. re-paint all walls & ceiling. not moving or adding any walls | $18,000 |
| Dec 6, 2010 | Completed final sign-off Mar 2012 | 4420 20th St | replace plumbing fixtures in kitchen and bathroom, replace (e) electrical fixtures throughout dwelling, add electrical outlets to bring to code, trim, paint, install wall board, retile bathroom, replace interior doorsDetails
replace plumbing fixtures in kitchen and bathroom, replace (e) electrical fixtures throughout dwelling, add electrical outlets to bring to code, trim, paint, install wall board, retile bathroom, replace interior doors | $50,385 |
| Apr 15, 2010 | Completed final sign-off Aug 2010 | 3228 Washington St | remodel 2 bathrooms. bath 1 replace toilet/replace vanity and sink, replace shower with tub.replace e wall mounted lights add radiant floor heat. bath 2: replace toilet/replace vanity and sink/replace tub with shower/Details
remodel 2 bathrooms. bath 1 replace toilet/replace vanity and sink, replace shower with tub.replace e wall mounted lights add radiant floor heat. bath 2: replace toilet/replace vanity and sink/replace tub with shower/ | $36,000 |
| Jan 25, 2010 | Expired or cancelled expired Mar 2012 | 2063 17th Av | unit #2063-upgrade electrical, replace lath & plaster with drywall. replace kitchen cabinets, new gas line to fireplace, replace bathroom & kitchen fixtures in (e) locations. refinish floors, insulate & paint. no adding or moving wallsDetails
unit #2063-upgrade electrical, replace lath & plaster with drywall. replace kitchen cabinets, new gas line to fireplace, replace bathroom & kitchen fixtures in (e) locations. refinish floors, insulate & paint. no adding or moving walls | $60,000 |
| Nov 2, 2009 | Completed final sign-off Apr 2010 | 974 Haight St | add door way in non structural kitchen wall, replacing counter tops, sink & fixtures using existing plumbing. retile 2 1/2 baths, replace vanities & fixtures, install new tubs (2) with existing plumbing. replace light fixtures in kitchen & baths w/existing electrical. locations & circuits. replaceDetails
add door way in non structural kitchen wall, replacing counter tops, sink & fixtures using existing plumbing. retile 2 1/2 baths, replace vanities & fixtures, install new tubs (2) with existing plumbing. replace light fixtures in kitchen & baths w/existing electrical. locations & circuits. replace | $35,700 |
| May 6, 2009 | Completed final sign-off Jul 2009 | 461 14th St | remove/replace tub from east wall to south wall & replace vanity/sink, replace (e) & new fixtures, outlet, add skylight, toilet, sconce (light) at bathroom on 3rd floor.wall believed to be non bearing.Details
remove/replace tub from east wall to south wall & replace vanity/sink, replace (e) & new fixtures, outlet, add skylight, toilet, sconce (light) at bathroom on 3rd floor.wall believed to be non bearing. | $20,000 |
| Apr 1, 2008 | Completed final sign-off Aug 2008 | 1328 Green St | interior remodel of 2 ex. bathroom on the ground floor. provide new fixtures and finishes. create 1 new closet. bathroom off hallway combine toilet room to create full bath. (e) powder room install shower and toilet to create full bath.Details
interior remodel of 2 ex. bathroom on the ground floor. provide new fixtures and finishes. create 1 new closet. bathroom off hallway combine toilet room to create full bath. (e) powder room install shower and toilet to create full bath. | $80,000 |