Permit GraphShortlistSan Francisco building permits since 2000

Vladimir Vinarskiy Dba V & V Electric

Contractor license
838299
State license record
Based in
Belmont
On San Francisco permits
Dec 2015 to Mar 2024
Last 24 months
0 permits filed

5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Kitchen remodel 1Bathroom remodel 1

1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 30, 2019Never finaled
issued Apr 2019, no final
1118 Eddy Stbath remodel. approx 60 sf in same location , replace tub, shower, sink, toilet. wc </=1.28 g pf, 1.8 gpm, lights per 2016 cenc 150.(k)
Details
Permit
201904309309
Status
issued
Filed
Apr 30, 2019
Permit issued
Apr 30, 2019
Declared cost
$30,000
Address
1118 Eddy St

bath remodel. approx 60 sf in same location , replace tub, shower, sink, toilet. wc </=1.28 g pf, 1.8 gpm, lights per 2016 cenc 150.(k)

Open the permit page

$30,000