Vitos Construction
- Based in
- San Mateo
- On San Francisco permits
- Aug 2012 to Jun 2026
- Last 24 months
- 3 permits filed
14 permits since 2000: 8 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 850 Corbett Av | unit 4: kitchen remodeling in kind (no frame work)Details
unit 4: kitchen remodeling in kind (no frame work) | $25,000 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 2647 Lombard St | deck dry rot repairs, not visible from st. deck in rear. less than 50%, all repairs in kind.Details
deck dry rot repairs, not visible from st. deck in rear. less than 50%, all repairs in kind. | $10,000 |
| Jan 29, 2025 | Completed final sign-off May 2025 | 1580 Pacific Av | replace kitchen cabinets.Details
replace kitchen cabinets. | $20,000 |
| Jan 4, 2024 | Completed final sign-off Mar 2024 | 850 Corbett Av | master bathroom remodeling in kind. replace plumbing and electric features. replace vanity new tiles.Details
master bathroom remodeling in kind. replace plumbing and electric features. replace vanity new tiles. | $25,000 |
| Sep 18, 2023 | Completed final sign-off Dec 2023 | 4438 California St | dry rot repair. stucco repair. painting. stucco repair not to exceed 350 square feet.Details
dry rot repair. stucco repair. painting. stucco repair not to exceed 350 square feet. | $10,000 |
| Aug 25, 2022 | Never finaled issued Nov 2022, no final | 241 Gates St | remove interior wall(s) btwn living/kitchen/dining/living rooms; 2/f: add new bath, raise ceiling/add skylight; 1/f kitchen renovation; basement add shear/support walls; add closets at (e) bedroomsDetails
remove interior wall(s) btwn living/kitchen/dining/living rooms; 2/f: add new bath, raise ceiling/add skylight; 1/f kitchen renovation; basement add shear/support walls; add closets at (e) bedrooms | $100,000 |
| Aug 2, 2019 | Expired or cancelled expired Oct 2024 | 239 Clinton Pk | revision to 201812208868 new beam at 1st flrDetails
revision to 201812208868 new beam at 1st flr | |
| Feb 14, 2019 | Expired or cancelled expired Oct 2024 | 239 Clinton Pk | rev to pa# 201812208868; voluntary structural upgrade-interior work onlyDetails
rev to pa# 201812208868; voluntary structural upgrade-interior work only | $15,000 |
| Jan 29, 2019 | Expired or cancelled expired Oct 2024 | 239 Clinton Pk | add 4th story addition and roof decks. (n) rear addition at 2nd and 3rd flrs. replace garage door at 1st level. fire sprinklers under separated permit. **maher n/a**Details
add 4th story addition and roof decks. (n) rear addition at 2nd and 3rd flrs. replace garage door at 1st level. fire sprinklers under separated permit. **maher n/a** | $130,000 |
| Dec 20, 2018 | Expired or cancelled expired Oct 2024 | 239 Clinton Pk | renovate 2 units on 3 floors, reconfigure (e) stairs, in-fill (e) lightwell on 3rd fl.Details
renovate 2 units on 3 floors, reconfigure (e) stairs, in-fill (e) lightwell on 3rd fl. | $158,000 |
| Dec 13, 2018 | Expired or cancelled expired Oct 2024 | 239 Clinton Pk | open walls for rewiring, maintain existing insulation. no other work under this permit. patch walls in kind after workDetails
open walls for rewiring, maintain existing insulation. no other work under this permit. patch walls in kind after work | $5,000 |
| Sep 24, 2013 | Completed final sign-off Apr 2014 | 35 Santa Rosa Av | remodel extg storage space on the 1st floor including new bathroom & closet. replace sliding patio door. include new lighting & plumbing.Details
remodel extg storage space on the 1st floor including new bathroom & closet. replace sliding patio door. include new lighting & plumbing. | $9,500 |
| Mar 20, 2013 | Completed final sign-off May 2013 | 679 Spruce St | front stairs in-kind replacement. work within property line.Details
front stairs in-kind replacement. work within property line. | $5,000 |
| Aug 21, 2012 | Completed final sign-off Sep 2012 | 1563 Fulton St | repair stair on back side of building in kind: replace two stringers, risers and treads of lowest flight. total less than 50% of stairs.Details
repair stair on back side of building in kind: replace two stringers, risers and treads of lowest flight. total less than 50% of stairs. | $2,500 |