Vital Systems
- Based in
- Berkeley
- On San Francisco permits
- Feb 2000 to Jun 2000
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2000 | Completed final sign-off Feb 2001 | 4279 22nd St | revision to #9914544: skylight, ridge beam, foront window, 1hr. wall, add stairsDetails
revision to #9914544: skylight, ridge beam, foront window, 1hr. wall, add stairs | $10,000 |
| Feb 23, 2000 | Expired or cancelled expired Jun 2000 | 4279 22nd St | drop insulation bet joists replace sub flooringDetails
drop insulation bet joists replace sub flooring | |
| Feb 23, 2000 | Completed final sign-off Feb 2001 | 4279 22nd St | change tile with gree dry wall, replace shower,titleDetails
change tile with gree dry wall, replace shower,title |