Back to bathroom remodel contractors
Vision Painting And Construction
- Based in
- Woodacre
- On San Francisco permits
- Apr 2013 to May 2018
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 never finaled. Typically 0 days from filing to permit and 516 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2018 | Completed final sign-off Jan 2020 | 2415 Buchanan St | upgrade all electrical upgrade all plumbing, new kitchen. renovate (e) bathroom. add new powder roomDetails
upgrade all electrical upgrade all plumbing, new kitchen. renovate (e) bathroom. add new powder room | $225,000 |
| Sep 21, 2017 | Never finaled issued Sep 2017, no final | 2364 Pacific Av | 4 units kitchen cabinets . bathroom - replace fixtures, tubs - shower and new tiles.Details
4 units kitchen cabinets . bathroom - replace fixtures, tubs - shower and new tiles. | $160,000 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 2364 Pacific Av | remodel of units 2, 3, 6 and 7 - install kitchen cabinets; bathroom - replace all fixtures, tub to be replaced by shower, new tileDetails
remodel of units 2, 3, 6 and 7 - install kitchen cabinets; bathroom - replace all fixtures, tub to be replaced by shower, new tile | $160,000 |
| Sep 28, 2015 | Completed final sign-off Feb 2017 | 2415 Buchanan St | units #2,4, & 6: upgrade electrical, upgrade plumbing, and renovate kitchen. renovate extg baths, add new water closet, add washer dryer units.Details
units #2,4, & 6: upgrade electrical, upgrade plumbing, and renovate kitchen. renovate extg baths, add new water closet, add washer dryer units. | $120,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2017 | 2415 Buchanan St | unit #3 remodel - upgrade all electrical & plumbing, renovate kitchen & (e) bath, add new water closet & washer/dryer untis to ermodelled kitchen, add new heater enclosure, add steam to main bathroom.Details
unit #3 remodel - upgrade all electrical & plumbing, renovate kitchen & (e) bath, add new water closet & washer/dryer untis to ermodelled kitchen, add new heater enclosure, add steam to main bathroom. | $65,000 |
| Sep 10, 2014 | Completed final sign-off Sep 2015 | 2415 Buchanan St | unit #1 - remove/add interior walls, remodel kitchen & bath, new water closet, add washer/dryer, upgrade to all electrical.Details
unit #1 - remove/add interior walls, remodel kitchen & bath, new water closet, add washer/dryer, upgrade to all electrical. | $40,000 |