Back to bathroom remodel contractors
Vision Builders Remodeling
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2001 to Apr 2026
- Last 24 months
- 2 permits filed
33 permits since 2000: 31 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2026 | Completed final sign-off May 2026 | 330 Berry St | bathroom remodel: master bathroom shower enclosement - remove all sheetrock and panels on shower walls/ remove and replace shower fixture. install waterproof paper, tile board and tile on walls. install new molded shower pan.Details
bathroom remodel: master bathroom shower enclosement - remove all sheetrock and panels on shower walls/ remove and replace shower fixture. install waterproof paper, tile board and tile on walls. install new molded shower pan. | $10,000 |
| Sep 12, 2025 | Completed final sign-off Dec 2025 | 600 Chestnut St | master & guest bathroom remodel (no walls removal), like for like, kitchen remodel (no wall removal), like for like, upgrade electrical panel in existing locationDetails
master & guest bathroom remodel (no walls removal), like for like, kitchen remodel (no wall removal), like for like, upgrade electrical panel in existing location | $99,500 |
| Aug 26, 2021 | Completed final sign-off Oct 2022 | 2298 Green St | unit #4: guest bathroom remodel. remove tub, sink, toilet, and fixtures. install in existing locationDetails
unit #4: guest bathroom remodel. remove tub, sink, toilet, and fixtures. install in existing location | $48,000 |
| Apr 7, 2021 | Completed final sign-off Oct 2022 | 2298 Green St | apt# 4 - remove shower, sink and toilet to (e) location bathroom remodel upgrade in-kind no layout changed.Details
apt# 4 - remove shower, sink and toilet to (e) location bathroom remodel upgrade in-kind no layout changed. | $57,000 |
| Sep 8, 2017 | Completed final sign-off Nov 2017 | 1856 Powell St | #202 - bathroom remodel : remove & replace tub, tub fixture recess lights, vanity , coutertop, sink, sheetrock, tile floor, exhaust fan, gfi outlet & paintingDetails
#202 - bathroom remodel : remove & replace tub, tub fixture recess lights, vanity , coutertop, sink, sheetrock, tile floor, exhaust fan, gfi outlet & painting | $20,000 |
| Jun 28, 2017 | Completed final sign-off Oct 2019 | 665 Andover St | interior remodel of bathroom & closet -add toilet @ 2nd floor - no exterior scope (roof vent for exhaust fan) add exhaust fan w/humidistat, replace all (e) plumbing fixtures, add a vanity, add a lavatory, replac eall (e) light fixtures w/(n) led fixtures. repalce finsihes.Details
interior remodel of bathroom & closet -add toilet @ 2nd floor - no exterior scope (roof vent for exhaust fan) add exhaust fan w/humidistat, replace all (e) plumbing fixtures, add a vanity, add a lavatory, replac eall (e) light fixtures w/(n) led fixtures. repalce finsihes. | $16,500 |
| Aug 29, 2008 | Completed final sign-off Aug 2009 | 2446 26th Av | bathroom remodel: remove and replace tub, toilet, sink, sheetrock walls and tile.Details
bathroom remodel: remove and replace tub, toilet, sink, sheetrock walls and tile. | $20,000 |
| Jan 18, 2007 | Completed final sign-off Apr 2007 | 75 Baltimore Wy | remove and replace to same location for kchn and bath. kchn:remove sheet rock appliances, cabnets and sink. bath: remove sheetrock tub, sink, and vanity cabntsDetails
remove and replace to same location for kchn and bath. kchn:remove sheet rock appliances, cabnets and sink. bath: remove sheetrock tub, sink, and vanity cabnts | $45,500 |
| Apr 2, 2002 | Completed final sign-off May 2002 | 353 Crestlake Dr | remodel bathroom no structure change shower and tub vanityDetails
remodel bathroom no structure change shower and tub vanity | $10,000 |
| Nov 14, 2001 | Completed final sign-off Jan 2002 | 2480 Fulton St | remodel bathroom @ apt.#1Details
remodel bathroom @ apt.#1 | $10,000 |