Back to bathroom remodel contractors
Vida Building Systems
- Based in
- Bolinas
- On San Francisco permits
- Sep 2010 to Aug 2017
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2016 | Completed final sign-off May 2016 | 4317 19th St | renovate (e) bath - replace tile, vanity, tub, toilet, re-paint, etc. no change to walls, doors or windows.Details
renovate (e) bath - replace tile, vanity, tub, toilet, re-paint, etc. no change to walls, doors or windows. | $25,000 |
| Feb 14, 2013 | Completed final sign-off Apr 2013 | 49 Seward St | #2- install new bathroom with new plumbing, electrical, shower and sinkDetails
#2- install new bathroom with new plumbing, electrical, shower and sink | $20,000 |