Back to bathroom remodel contractors
Victory Construction Inc.
- Based in
- Castro Valley
- On San Francisco permits
- Feb 2008 to May 2013
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 1 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2013 | Completed final sign-off Jun 2013 | 250 Corona St | full remodeling of master bathroom on 2nd floor. no work on first floor.Details
full remodeling of master bathroom on 2nd floor. no work on first floor. | $15,000 |
| Mar 22, 2012 | Completed final sign-off Jun 2012 | 4528 Fulton St | revision to pa #201110287881: scope of work is to remodel a total of 4 bathrooms. reduce scope of work to exclude remodel of 1st floor entry way.Details
revision to pa #201110287881: scope of work is to remodel a total of 4 bathrooms. reduce scope of work to exclude remodel of 1st floor entry way. | $11,000 |
| Nov 30, 2010 | Completed final sign-off Nov 2011 | 45 Maywood Dr | remodel kitchen, including change location of sink and repl. 2 windows; remodel 1 bathroom, including enlarging window - all fixtures same location; reomdel 2nd bathroom - all fixtures remain same locationDetails
remodel kitchen, including change location of sink and repl. 2 windows; remodel 1 bathroom, including enlarging window - all fixtures same location; reomdel 2nd bathroom - all fixtures remain same location | $30,000 |
| Apr 2, 2010 | Completed final sign-off Jun 2010 | 323 West Portal Av | tenant improvement. change of use from delicatessen to dog grooming. new interior partition, dog bath area, new drain, new electrical, reception, finishes, and replace awning. work on ground/street level.Details
tenant improvement. change of use from delicatessen to dog grooming. new interior partition, dog bath area, new drain, new electrical, reception, finishes, and replace awning. work on ground/street level. | $27,350 |