Victor Construction & Engineering
- Based in
- San Rafael
- On San Francisco permits
- Feb 2019 to Feb 2026
- Last 24 months
- 4 permits filed
11 permits since 2000: 9 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | In progress issued Feb 2026 | 267 Surrey St | repair corner trim from dryrot at joint of eave overhang back of home only. not visible from street.Details
repair corner trim from dryrot at joint of eave overhang back of home only. not visible from street. | $5,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 15 Red Rock Wy | to install proper beam and post per engineer specs and plans. removal of an interior wood bearing wall.Details
to install proper beam and post per engineer specs and plans. removal of an interior wood bearing wall. | $5,000 |
| Jun 3, 2025 | Completed final sign-off Jul 2025 | 2626 35th Av | install bolting around mudsill approx 32 inches around the garage (5/8" diam all thread, 7" min embed, simpson set-xp). install a35 bracket every 16 inches at joist diaphragm.Details
install bolting around mudsill approx 32 inches around the garage (5/8" diam all thread, 7" min embed, simpson set-xp). install a35 bracket every 16 inches at joist diaphragm. | $12,000 |
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 485 Grove St | fix water leak at top of window at back of home. repair in kind.Details
fix water leak at top of window at back of home. repair in kind. | $5,000 |
| Sep 6, 2024 | Completed final sign-off May 2025 | 3058 Turk Bl | remove existing dry-rotted wood post and install new steel post, removal and replacement of (4), street-facing, wood/aluminum clad, windows.Details
remove existing dry-rotted wood post and install new steel post, removal and replacement of (4), street-facing, wood/aluminum clad, windows. | $4,000 |
| Jul 19, 2024 | Completed final sign-off May 2025 | 3058 Turk Bl | stucco repair up front lower section.Details
stucco repair up front lower section. | $10,000 |
| Jul 26, 2023 | Completed final sign-off Dec 2023 | 135 Garcia Av | repair dryrot and stucco ( front of the house). approx. 500 s.f.Details
repair dryrot and stucco ( front of the house). approx. 500 s.f. | $20,000 |
| Jul 26, 2023 | Completed final sign-off Jul 2024 | 379 Chestnut St | to comply with boa decision to 22-093. revise 202206146293 to set back railing 4 feet from property line at the lightwell; a solid wood railing at lightwell and height of the railing shall be 60 inchesDetails
to comply with boa decision to 22-093. revise 202206146293 to set back railing 4 feet from property line at the lightwell; a solid wood railing at lightwell and height of the railing shall be 60 inches | |
| Dec 28, 2022 | Completed final sign-off Sep 2023 | 3820 Balboa St | replace in kind of steel support post. no change to framing, floor area, height, legal usage or setbacks. to comply with nov #2022997696Details
replace in kind of steel support post. no change to framing, floor area, height, legal usage or setbacks. to comply with nov #2022997696 | $7,000 |
| Jun 14, 2022 | Completed final sign-off May 2025 | 379 Chestnut St | comply w/ nov 202175327. replace in kind of wood framed utility platform on existing roof w/ (e) bur roofing.Details
comply w/ nov 202175327. replace in kind of wood framed utility platform on existing roof w/ (e) bur roofing. | $5,000 |
| Feb 15, 2019 | Never finaled issued Mar 2019, no final | 140 Day St | soft story retrofit per sfebc chapter 4d engineering criteria fema p-807.Details
soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. | $170,000 |