Ventelo Management
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Jul 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2025 | Completed final sign-off Jan 2026 | 340 Arguello Bl | replace all windows with andersen fibrex windows. front elevation window heights to reduce by 10 inches. no structural work.(- 82 windows)Details
replace all windows with andersen fibrex windows. front elevation window heights to reduce by 10 inches. no structural work.(- 82 windows) | $70,000 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 340 Arguello Bl | #305:remove and replace bathroom finishes, move electrical panel out of closet. no structural work.Details
#305:remove and replace bathroom finishes, move electrical panel out of closet. no structural work. | $28,000 |
| May 16, 2023 | Completed final sign-off Aug 2023 | 1245 10th Av | unit# 204: remove and replace (1) bathroom finishes in-kind and (1) kitchen counters/backsplash only, remove living room decorative gas fireplace insert.Details
unit# 204: remove and replace (1) bathroom finishes in-kind and (1) kitchen counters/backsplash only, remove living room decorative gas fireplace insert. | $18,000 |
| Feb 1, 2023 | Completed final sign-off May 2023 | 174 20th Av | unit #305: remove and replace kitchen and bath finishes. remove bearing wall between kitchen and living room and relocate electrical subpanel out of closet.Details
unit #305: remove and replace kitchen and bath finishes. remove bearing wall between kitchen and living room and relocate electrical subpanel out of closet. | $53,000 |
| Aug 30, 2022 | Completed final sign-off Jan 2023 | 340 Arguello Bl | apt 306 - 3rd flr: replace kitchen and bath finishes, remove non bearing walls at kitchen. relocate electrical panel from bedroom closet to bedroom.Details
apt 306 - 3rd flr: replace kitchen and bath finishes, remove non bearing walls at kitchen. relocate electrical panel from bedroom closet to bedroom. | $45,000 |
| Aug 27, 2021 | Completed final sign-off Nov 2021 | 299 Arguello Bl | #302. remove and replace kitchen and bath finishes, move electrical panel out of closet . no structural work.Details
#302. remove and replace kitchen and bath finishes, move electrical panel out of closet . no structural work. | $45,000 |
| Nov 25, 2019 | Completed final sign-off Feb 2020 | 299 Arguello Bl | unit 203 - replace kitchen and bath finishes, relocate electrical panel out of closet. no structural workDetails
unit 203 - replace kitchen and bath finishes, relocate electrical panel out of closet. no structural work | $35,000 |
| Sep 18, 2019 | Completed final sign-off Jan 2020 | 174 20th Av | unit 301; remove and replace kitchen and bath finishes, remove bearing wall between kitchen and living room, relocate elec panel out of closetDetails
unit 301; remove and replace kitchen and bath finishes, remove bearing wall between kitchen and living room, relocate elec panel out of closet | $35,000 |
| Aug 19, 2019 | Completed final sign-off Nov 2019 | 340 Arguello Bl | unit 206 - remove non-bearing partitions in kitchen; relocate electrical panel out of closet; remove and replace kitchen and bath finishesDetails
unit 206 - remove non-bearing partitions in kitchen; relocate electrical panel out of closet; remove and replace kitchen and bath finishes | $35,000 |
| Jun 7, 2019 | Completed final sign-off Jul 2019 | 1245 10th Av | unit 105: remove & replace finishes in full bath and half bath. relocate electrical panel from closet into bedroom. no structural workDetails
unit 105: remove & replace finishes in full bath and half bath. relocate electrical panel from closet into bedroom. no structural work | $25,000 |
| Feb 26, 2019 | Completed final sign-off May 2019 | 174 20th Av | #205: remove portion of wall, replace with wood beam.Details
#205: remove portion of wall, replace with wood beam. | $2,000 |
| Oct 1, 2018 | Completed final sign-off Jan 2019 | 174 20th Av | unit 101 & 201. r&r kitchen, bath, finishes. remove bearing wall btw kit & liv rm. relocate ele sub panel.Details
unit 101 & 201. r&r kitchen, bath, finishes. remove bearing wall btw kit & liv rm. relocate ele sub panel. | $45,000 |
| Oct 1, 2018 | Completed final sign-off Jan 2019 | 174 20th Av | remove & repalce stucco below front first flr window, repair dry rot in like kindDetails
remove & repalce stucco below front first flr window, repair dry rot in like kind | $8,500 |
| Sep 20, 2018 | Completed final sign-off Apr 2022 | 1401 Noriega St | legalize existing unwarranted unit #203 at 3rd floor. per oridnace 43-14. 1 bedroom & 1 bath.Details
legalize existing unwarranted unit #203 at 3rd floor. per oridnace 43-14. 1 bedroom & 1 bath. | $31,000 |
| Feb 22, 2018 | Completed final sign-off May 2018 | 66 Crestline Dr | revision to soft story 201706149805, (soft story retrofit per sfebc ch 4d engineering criteria 2016 cebc app a-4.) replace hardy frame special moment frames to odinary moment framesDetails
revision to soft story 201706149805, (soft story retrofit per sfebc ch 4d engineering criteria 2016 cebc app a-4.) replace hardy frame special moment frames to odinary moment frames | |
| Apr 24, 2017 | Completed final sign-off Aug 2017 | 299 Arguello Bl | unit 101: remove and replace kitchen and bath finishes. remove non bearing walls at kitchen. relocate elec panel. no structural workDetails
unit 101: remove and replace kitchen and bath finishes. remove non bearing walls at kitchen. relocate elec panel. no structural work | $35,000 |
| Apr 24, 2017 | Completed final sign-off Aug 2017 | 340 Arguello Bl | unit # 106: remove and replace kitchen and bath finishes. remove non bearing walls at kitchen. relocate electric panel. no structuralDetails
unit # 106: remove and replace kitchen and bath finishes. remove non bearing walls at kitchen. relocate electric panel. no structural | $25,000 |
| Apr 24, 2017 | Completed final sign-off Aug 2017 | 299 Arguello Bl | unit 201: remove and replace kitchen and bath finishes. remove non bearing kitchen walls. relocate elec panel. no strucutural workDetails
unit 201: remove and replace kitchen and bath finishes. remove non bearing kitchen walls. relocate elec panel. no strucutural work | $25,000 |
| Aug 2, 2016 | Completed final sign-off Oct 2016 | 1801 21st Av | #202 -remove and replace kitchen and bath finishes and partial ceiling sheetrock to investiage potential water intrusion.Details
#202 -remove and replace kitchen and bath finishes and partial ceiling sheetrock to investiage potential water intrusion. | $25,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 340 Arguello Bl | remove and replace finishes in bathroom and kitchen of unit 205 and 308. add lights in living rooms and relocate electrical panels from closets to baedroom. no structural or exterior work.Details
remove and replace finishes in bathroom and kitchen of unit 205 and 308. add lights in living rooms and relocate electrical panels from closets to baedroom. no structural or exterior work. | $40,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2015 | 66 Crestline Dr | replace siding on front elevation, replace water damaged sheathing as needed, replace front elevation windows no size change. hardi siding to match existing, windows to match existing orignal alumnium windows.Details
replace siding on front elevation, replace water damaged sheathing as needed, replace front elevation windows no size change. hardi siding to match existing, windows to match existing orignal alumnium windows. | $35,000 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 174 20th Av | units #204 & 304: remove wall at kitchen and remove/replace kitchen & bath finishes.Details
units #204 & 304: remove wall at kitchen and remove/replace kitchen & bath finishes. | $35,000 |