Venova Construction Inc
- Based in
- Rodeo
- On San Francisco permits
- Jul 2021 to Jan 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2022 | Completed final sign-off Apr 2023 | 2655 Bush St | unit 408. kitchen: install pantry cabinet, second bathroom remodel like for like. finish carpentry throughout interior house. interior paint throughout house. reinstall ceiling lights, switches, outlets, cover plates. reinstall missing floor tile at laundry and second bath.Details
unit 408. kitchen: install pantry cabinet, second bathroom remodel like for like. finish carpentry throughout interior house. interior paint throughout house. reinstall ceiling lights, switches, outlets, cover plates. reinstall missing floor tile at laundry and second bath. | $15,000 |
| Jan 10, 2022 | Completed final sign-off Jan 2023 | 2655 Bush St | unit 306. kitchen remodel like for like. interior paint all house. finish carpentry interior throughout house. bathroom vanity removal and install new. reinstall ceiling lights, switch, and outlets/cover plates.Details
unit 306. kitchen remodel like for like. interior paint all house. finish carpentry interior throughout house. bathroom vanity removal and install new. reinstall ceiling lights, switch, and outlets/cover plates. | $15,000 |
| Jul 8, 2021 | Never finaled issued Jul 2021, no final | 2655 Bush St | unit 308: install new circuit 12 gauge wire with 15 amp breaker for (4) ceiling lights @ living room & (4) ceiling lights @ guest bedroom #1. remove shower tub & replace w/tile @ 1/fDetails
unit 308: install new circuit 12 gauge wire with 15 amp breaker for (4) ceiling lights @ living room & (4) ceiling lights @ guest bedroom #1. remove shower tub & replace w/tile @ 1/f | $1,100 |