Back to bathroom remodel contractors
Varas Construction
- Based in
- Burlingame
- On San Francisco permits
- May 2001 to Apr 2006
- Last 24 months
- 0 permits filed
14 permits since 2000: 9 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2002 | Completed final sign-off Feb 2003 | 34 Harold Av | gr floor: bath replace shower w new,toilet,med cabinet,ext wndw,add gfi,water htr upstairs: windws,Details
gr floor: bath replace shower w new,toilet,med cabinet,ext wndw,add gfi,water htr upstairs: windws, | |
| Jun 12, 2001 | Completed final sign-off Nov 2001 | 212 Granada Av | replace cabinet and counter at kitchen sink, replace toilet, shower, sink at bathroom, new tiles atDetails
replace cabinet and counter at kitchen sink, replace toilet, shower, sink at bathroom, new tiles at | $5,000 |