Back to bathroom remodel contractors
Valex Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Jul 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 96 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
65 bathroom remodel permits: 62 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 866 35th Av | addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry.Details
addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry. | $400,000 |
| Mar 2, 2026 | Completed final sign-off Jun 2026 | 2207 21st Av | renovation of (e)1708sqft. 2 stories 5 bedrooms & 4 baths sfh. sqft remain the same. level 1 demo of non-load bearing walls, combine bedroom# 5 and hallway #2 into family room, relocate (e) washer and dryer into the (n) laundry room. eleminate bathroom #3. new light, modify rear doorsDetails
renovation of (e)1708sqft. 2 stories 5 bedrooms & 4 baths sfh. sqft remain the same. level 1 demo of non-load bearing walls, combine bedroom# 5 and hallway #2 into family room, relocate (e) washer and dryer into the (n) laundry room. eleminate bathroom #3. new light, modify rear doors | $17,000 |
| Feb 25, 2026 | In progress issued Mar 2026 | 3347 21st St | remodeling of existing bathroom , install new vanity, tub to shower, toilet, lights. plumbing and electrical updates.Details
remodeling of existing bathroom , install new vanity, tub to shower, toilet, lights. plumbing and electrical updates. | $28,000 |
| Nov 26, 2025 | Completed final sign-off Jun 2026 | 4638 California St | remodeling of existing kitchen, bathroom, add 2nd bathroom, updrate electrical, refinish hardwood floor, painting, install washer/dryer.Details
remodeling of existing kitchen, bathroom, add 2nd bathroom, updrate electrical, refinish hardwood floor, painting, install washer/dryer. | $85,000 |
| Oct 7, 2025 | Completed final sign-off Jun 2026 | 4640 California St | remodeling of existing kitchen, bathroom, toilet room, in kind, same location, upgrade electrical, refinish hardwood floor, painting.Details
remodeling of existing kitchen, bathroom, toilet room, in kind, same location, upgrade electrical, refinish hardwood floor, painting. | $80,000 |
| Aug 30, 2024 | Completed final sign-off Jun 2025 | 115 Otsego Av | 1st fl: add a bedroom, a family room with a wet bar & bathroom 2nd fl: relocate interior stair and add a powder roomDetails
1st fl: add a bedroom, a family room with a wet bar & bathroom 2nd fl: relocate interior stair and add a powder room | $80,000 |
| Feb 15, 2024 | Completed final sign-off Sep 2024 | 1570 21st Av | remodel existing kitchen and (2) bathrooms. replace shower with toilet at 2nd bath. relocate door to lightwell.Details
remodel existing kitchen and (2) bathrooms. replace shower with toilet at 2nd bath. relocate door to lightwell. | $58,000 |
| Nov 17, 2023 | Completed final sign-off Feb 2024 | 1470 40th Av | remodeling of existing (1) kitchen and (1) bathroom on the 2/fDetails
remodeling of existing (1) kitchen and (1) bathroom on the 2/f | $36,000 |
| Oct 20, 2023 | Completed final sign-off Feb 2024 | 85 Manor Dr | reconfiguration of (e) 3/f bathroom w/addition of tub/toiletDetails
reconfiguration of (e) 3/f bathroom w/addition of tub/toilet | $28,000 |
| Nov 10, 2022 | Completed final sign-off Feb 2026 | 1834 32nd Av | 1st level:convert 554 sf of(e)non-conditioned area to a conditioned bedroom,family room,a bath &(n)stairs connecting to fl above.(n)window & door to rear of house.2nd level:(n)99 sf additon to the rear of the house,(e)bath to be renovated,1 additional bath added.Details
1st level:convert 554 sf of(e)non-conditioned area to a conditioned bedroom,family room,a bath &(n)stairs connecting to fl above.(n)window & door to rear of house.2nd level:(n)99 sf additon to the rear of the house,(e)bath to be renovated,1 additional bath added. | $185,000 |
| Nov 7, 2022 | Completed final sign-off Dec 2022 | 2486 44th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Dec 6, 2021 | Completed final sign-off Jul 2022 | 38 Stanford Heights Av | renovation of an extg kitchen and an extg bathroom, replace an extg gas fire place with new gas fireplace, new skylight.Details
renovation of an extg kitchen and an extg bathroom, replace an extg gas fire place with new gas fireplace, new skylight. | $75,000 |
| Oct 25, 2021 | Completed final sign-off Aug 2023 | 265 Joost Av | 1/f: interior remodel, add a bedroom and a full bathroom.Details
1/f: interior remodel, add a bedroom and a full bathroom. | $40,000 |
| Sep 23, 2021 | Completed final sign-off Dec 2021 | 2454 Great Hy | remodel of existing bathroom. install new tub, vanity, toilet, tile. led lights w/occ sensors. (n) exhaust fan, vent to outside. no wall layout change, no wall and framing demo.Details
remodel of existing bathroom. install new tub, vanity, toilet, tile. led lights w/occ sensors. (n) exhaust fan, vent to outside. no wall layout change, no wall and framing demo. | $14,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2021 | 44 Dublin St | remodel of (e) one kitchen and one bathroom. install new cabinets, stove, hood, dwm, garbage disposal, sink, toilet, bathtub, vanity. (non-structural)Details
remodel of (e) one kitchen and one bathroom. install new cabinets, stove, hood, dwm, garbage disposal, sink, toilet, bathtub, vanity. (non-structural) | $28,000 |
| Apr 6, 2021 | Completed final sign-off Jun 2021 | 14 Springfield Dr | remodeling existing kitchen in kind and half bath in kindDetails
remodeling existing kitchen in kind and half bath in kind | $18,000 |
| Mar 2, 2021 | Completed final sign-off Jul 2021 | 3238 Balboa St | unit b, 3rd floor: 1) remodeling at existing master bath in kind 2. remodeling of existing hallbath in kind 3. remodeling of existing kitchen in kind.Details
unit b, 3rd floor: 1) remodeling at existing master bath in kind 2. remodeling of existing hallbath in kind 3. remodeling of existing kitchen in kind. | $48,000 |
| Feb 10, 2021 | Completed final sign-off Mar 2021 | 1224 27th Av | remodeling of (e) bathroom on 2/f. install tile, new vanity, ti9let, shower.Details
remodeling of (e) bathroom on 2/f. install tile, new vanity, ti9let, shower. | $18,000 |
| Nov 19, 2020 | Completed final sign-off Feb 2022 | 124 Otsego Av | in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyardDetails
in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyard | $28,000 |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 239 Castro St | work on 3rd floor includes reconfiguring the front bedroom to add a second bath & laundry. reconfigure the (e) bath & master closet into master bath suite.Details
work on 3rd floor includes reconfiguring the front bedroom to add a second bath & laundry. reconfigure the (e) bath & master closet into master bath suite. | $50,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2021 | 1468 Sanchez St | interior remodel 1st fl - renovate bath in-kind, add closet; 2nd fl - remodel kitchen & bath, remove 2 interior load bearing walls, new patio door at rear wall, replace gas fireplace unit; 3rd fl - renovate bath in-kind. rear yard property line fence replaceDetails
interior remodel 1st fl - renovate bath in-kind, add closet; 2nd fl - remodel kitchen & bath, remove 2 interior load bearing walls, new patio door at rear wall, replace gas fireplace unit; 3rd fl - renovate bath in-kind. rear yard property line fence replace | $150,000 |
| Jan 7, 2020 | Completed final sign-off Feb 2020 | 149 San Jose Av | unit #1. remodeling of existing bathroom: convert bath tub to the custom shower, install new toilet, vanity 5x8.Details
unit #1. remodeling of existing bathroom: convert bath tub to the custom shower, install new toilet, vanity 5x8. | $12,000 |
| Nov 12, 2019 | Completed final sign-off Dec 2019 | 508 Linden St | apt 1: remodeling of (e) bathroom. convert tub to custom shower, install new toilet, vanity, tile, electrical and plumbing work.Details
apt 1: remodeling of (e) bathroom. convert tub to custom shower, install new toilet, vanity, tile, electrical and plumbing work. | $12,000 |
| Oct 16, 2019 | Completed final sign-off Dec 2019 | 282 Moscow St | existing bathroom remodeling (2nd floor): install new toilet vanity, tub, tile work, electrical and plumbing. no change to walls & openings layoutDetails
existing bathroom remodeling (2nd floor): install new toilet vanity, tub, tile work, electrical and plumbing. no change to walls & openings layout | $15,000 |
| Aug 6, 2019 | Completed final sign-off Sep 2019 | 663 Joost Av | remodeling of existing bathroom (1) and half bathroom (1). install tub(1) toilet (2) vanity (2) and fan (2) second floor.Details
remodeling of existing bathroom (1) and half bathroom (1). install tub(1) toilet (2) vanity (2) and fan (2) second floor. | $18,000 |
| Jun 17, 2019 | Completed final sign-off Aug 2019 | 1454 36th Av | remodeling of bathrooms(2) and kitchen (upper floor)Details
remodeling of bathrooms(2) and kitchen (upper floor) | $35,000 |
| May 6, 2019 | Completed final sign-off Jun 2019 | 57 Saturn St | remodeling of existing bathroom, upper floor, install new vanity, shower, toilet.Details
remodeling of existing bathroom, upper floor, install new vanity, shower, toilet. | $15,000 |
| Mar 19, 2019 | Completed final sign-off May 2019 | 2224 Lawton St | remodeling of (e) bathroom upstairsDetails
remodeling of (e) bathroom upstairs | $12,000 |
| Mar 11, 2019 | Completed final sign-off Sep 2020 | 519 Hamilton St | new bedroom, 3 fixture bath and family room addition at lower level and minor alteration to (e) kitchen wall @ upper level. also includes new deck at rear yardDetails
new bedroom, 3 fixture bath and family room addition at lower level and minor alteration to (e) kitchen wall @ upper level. also includes new deck at rear yard | $60,000 |
| Feb 25, 2019 | Completed final sign-off Nov 2019 | 404 Dellbrook Av | remodeling of existing kitchen and bathroom at upper level. update plumbing and electrical. new drywall, tile, cabinets, appliances. no change in existing floor plan.Details
remodeling of existing kitchen and bathroom at upper level. update plumbing and electrical. new drywall, tile, cabinets, appliances. no change in existing floor plan. | $25,000 |
| Dec 27, 2018 | Completed final sign-off Mar 2019 | 647 Spruce St | to comply with complaint#201808485. remodeling of (e) bathroom. install custom shower, new toilet & vanity. upgrade electrical in the entire unit.Details
to comply with complaint#201808485. remodeling of (e) bathroom. install custom shower, new toilet & vanity. upgrade electrical in the entire unit. | $20,000 |
| Aug 6, 2018 | Completed final sign-off Sep 2018 | 2217 28th Av | full remodeling of bathroom upper floor in-kind.Details
full remodeling of bathroom upper floor in-kind. | $12,000 |
| May 4, 2018 | Completed final sign-off Nov 2018 | 2438 41st Av | remodel kitchen and bath. repace fireplace w/ gpa certified wood heater & comply w/ obc 3112.3Details
remodel kitchen and bath. repace fireplace w/ gpa certified wood heater & comply w/ obc 3112.3 | $98,000 |
| Dec 13, 2017 | Completed final sign-off Jun 2018 | 71 Sanchez St | unit d: remodel of kitchen and bathroom and moving non structural wallsDetails
unit d: remodel of kitchen and bathroom and moving non structural walls | $40,000 |
| Oct 16, 2017 | Completed final sign-off Dec 2017 | 508 Linden St | (1) bathroom remodel. convert tub into custom shower, install wall light, tiling, appliances.Details
(1) bathroom remodel. convert tub into custom shower, install wall light, tiling, appliances. | $10,000 |
| Jul 31, 2017 | Completed final sign-off Dec 2017 | 15 Ardenwood Wy | bathroom remodel to single family home and bathroom addition and remove of exg fire place.Details
bathroom remodel to single family home and bathroom addition and remove of exg fire place. | $30,000 |
| May 5, 2017 | Completed final sign-off Sep 2017 | 925 Judah St | convert single bathroom to 2 baths in each unit. new plumbing & electrical. new closet in each unit. interior remodel - create seating bar looking into the kitchen.Details
convert single bathroom to 2 baths in each unit. new plumbing & electrical. new closet in each unit. interior remodel - create seating bar looking into the kitchen. | $50,000 |
| Apr 11, 2017 | Completed final sign-off Jun 2017 | 4036 Pacheco St | full remodeling of (e) kitchen & bathroom, rough & finish plumbing & electrical work surface preparation cabinetry tile work appliances, install ation no alteration of wall, windows, & doorDetails
full remodeling of (e) kitchen & bathroom, rough & finish plumbing & electrical work surface preparation cabinetry tile work appliances, install ation no alteration of wall, windows, & door | $23,000 |
| Jan 6, 2017 | Completed final sign-off Feb 2017 | 1915 Funston Av | full remodel (1) bathroom 1st floor. convert bathtub into shower. no alteration of wall, window and door.Details
full remodel (1) bathroom 1st floor. convert bathtub into shower. no alteration of wall, window and door. | $9,000 |
| Sep 7, 2016 | Completed final sign-off Oct 2016 | 63 Rebecca Ln | remodeling one (e) bathroom on the top floor. rpelae toilet vanity. convert tub into shower.Details
remodeling one (e) bathroom on the top floor. rpelae toilet vanity. convert tub into shower. | $8,000 |
| Jul 27, 2016 | Completed final sign-off Mar 2017 | 445 Kirkham St | interior remodel to include new bathroom & new kitchen island. one exterior door ot replace existing window. repair interior stair to replace existing. new bathroom on ground floor.Details
interior remodel to include new bathroom & new kitchen island. one exterior door ot replace existing window. repair interior stair to replace existing. new bathroom on ground floor. | $95,000 |
| Oct 13, 2015 | Completed final sign-off May 2016 | 490 33rd Av | remodeling existing kitchen(1), bathroom(2), change elec panel. install recessed lights (20) in living & bedroom. all new lights shall be led. replace (e) exh fan in bathroom. unit 204Details
remodeling existing kitchen(1), bathroom(2), change elec panel. install recessed lights (20) in living & bedroom. all new lights shall be led. replace (e) exh fan in bathroom. unit 204 | $31,000 |
| Oct 5, 2015 | Completed final sign-off Nov 2015 | 1915 Funston Av | remodeling (e) bathroom on 2/f. no change to wall or fixture locations.Details
remodeling (e) bathroom on 2/f. no change to wall or fixture locations. | $7,000 |
| Jul 8, 2015 | Completed final sign-off Sep 2015 | 463 Nevada St | remodel master bathroom on 1/f: install closet orginizer (walk-in closet), change tank for tnakless water heater. no change.Details
remodel master bathroom on 1/f: install closet orginizer (walk-in closet), change tank for tnakless water heater. no change. | $20,000 |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 1201 06th Av | apt #6: remodeling existing bathroom (1) and kitchen (1). replace in kind. no structural work.Details
apt #6: remodeling existing bathroom (1) and kitchen (1). replace in kind. no structural work. | $15,000 |
| Oct 28, 2014 | Completed final sign-off Jan 2015 | 2250 14th Av | remodeling kitchen 8 bathrooms on 1st floor, new cabinets & appliances. new vanity, bathtub & toilet. no structural work. electrical & plumbing work.Details
remodeling kitchen 8 bathrooms on 1st floor, new cabinets & appliances. new vanity, bathtub & toilet. no structural work. electrical & plumbing work. | $31,000 |
| Nov 14, 2013 | Completed final sign-off Dec 2013 | 91 Coleridge St | remodeling bathroom (1st level), electrical and plumbing work, drywall inspection, tilingDetails
remodeling bathroom (1st level), electrical and plumbing work, drywall inspection, tiling | $12,000 |
| Jul 18, 2013 | Completed final sign-off Jul 2014 | 2907 Folsom St | 2nd & 3rd floors (both units): reconfigure (e) kitchen, add bath, remodel (e) bath, install wooden beams & posts, upgrade elec panels, install sub-panels. ground flr: install wooden posts & conc ftgs. relocate/replace furnaces, water heaters, install lighting, replace 14 windows & 2 french doors.Details
2nd & 3rd floors (both units): reconfigure (e) kitchen, add bath, remodel (e) bath, install wooden beams & posts, upgrade elec panels, install sub-panels. ground flr: install wooden posts & conc ftgs. relocate/replace furnaces, water heaters, install lighting, replace 14 windows & 2 french doors. | $100,000 |
| May 29, 2013 | Completed final sign-off Aug 2013 | 556 Ortega St | remodeling extg bathroom at 1st floor. install new vanity, electrical and plmg work. no structural work.Details
remodeling extg bathroom at 1st floor. install new vanity, electrical and plmg work. no structural work. | $10,000 |
| May 24, 2013 | Completed final sign-off Dec 2013 | 156 Lake Merced Hill So Bl | remodeling existing kitchen (1) and bathrooms (2) change electrical serviceDetails
remodeling existing kitchen (1) and bathrooms (2) change electrical service | $18,000 |
| May 8, 2013 | Completed final sign-off Jul 2013 | 1630 32nd Av | remodeling bathroom: replace tub, toilet, vanity with sink, fan light, new drywall, tile work.Details
remodeling bathroom: replace tub, toilet, vanity with sink, fan light, new drywall, tile work. | $8,000 |
| Nov 2, 2012 | Completed final sign-off May 2013 | 2190 31st Av | remodel 1st fl garage and storage space to have 1 bedroom, family room, study, entertainment room and 2 bathrooms. provide concrete retaining wall of 3 ft 8 inches at rear yardDetails
remodel 1st fl garage and storage space to have 1 bedroom, family room, study, entertainment room and 2 bathrooms. provide concrete retaining wall of 3 ft 8 inches at rear yard | $55,000 |
| Oct 10, 2012 | Completed final sign-off Aug 2013 | 715 Myra Wy | 1st floor: removing of extg family room and bar. on 1st floor construct family room, bedroom and bathroom.Details
1st floor: removing of extg family room and bar. on 1st floor construct family room, bedroom and bathroom. | $42,000 |
| May 29, 2012 | Completed final sign-off Jul 2012 | 600 Shields St | full remodeling bathroom: convert bath tub to custom shower. install new toilet, vanity, fan/light/heater, electrical and plumbing work, drywall, taping and sanding, painting, tile work.Details
full remodeling bathroom: convert bath tub to custom shower. install new toilet, vanity, fan/light/heater, electrical and plumbing work, drywall, taping and sanding, painting, tile work. | $7,000 |
| Nov 1, 2011 | Completed final sign-off Dec 2011 | 4096 17th St | remodeling existing bathroom (replace tub, vanity, toilet, plumbing and electrical work, drywall installation, tile, painting. no structural work.Details
remodeling existing bathroom (replace tub, vanity, toilet, plumbing and electrical work, drywall installation, tile, painting. no structural work. | $6,500 |
| Jul 13, 2011 | Completed final sign-off Aug 2011 | 2174 18th Av | remodeling bathroom: install new vanity, toilet, electrical work, tile work, painting.Details
remodeling bathroom: install new vanity, toilet, electrical work, tile work, painting. | $6,000 |
| Mar 25, 2011 | Completed final sign-off May 2011 | 2574 34th Av | remodel bathroom. elec and plumbing work, new tub, vanity, toiolet, fan/light, tile work. no structuralDetails
remodel bathroom. elec and plumbing work, new tub, vanity, toiolet, fan/light, tile work. no structural | $9,000 |
| Jul 10, 2009 | Completed final sign-off Sep 2009 | 1441 38th Av | kitchen & bathroom remodeling. new cabinets, new countertops, tile, new appliances. lighting kitchen 50% light watt to be high efficency. bathroom, high efficency lights or manual on occupancy sensor.Details
kitchen & bathroom remodeling. new cabinets, new countertops, tile, new appliances. lighting kitchen 50% light watt to be high efficency. bathroom, high efficency lights or manual on occupancy sensor. | $11,000 |
| Sep 12, 2008 | Completed final sign-off Mar 2009 | 1527 21st Av | remove closets in bedrooms on existing second floor. second floor improvement: construct new closet in bedroom #1. adding (2) closets and bathroom adjacent to bedroom #2. remodel kitchen. all improvements are within existing envelope.Details
remove closets in bedrooms on existing second floor. second floor improvement: construct new closet in bedroom #1. adding (2) closets and bathroom adjacent to bedroom #2. remodel kitchen. all improvements are within existing envelope. | $27,000 |
| Sep 10, 2008 | Completed final sign-off Dec 2008 | 1527 21st Av | ground floor remodel: remove e bdrm,storage,toilet rm. create 2 bedrooms, 1 full bath, 1 study room w/wet bar, 1 family room. new furnace, railing at int stairs, relocate laundry. storage and utility room adjacent to garage. french doors.Details
ground floor remodel: remove e bdrm,storage,toilet rm. create 2 bedrooms, 1 full bath, 1 study room w/wet bar, 1 family room. new furnace, railing at int stairs, relocate laundry. storage and utility room adjacent to garage. french doors. | $38,000 |
| Dec 18, 2007 | Completed final sign-off Aug 2008 | 16 Merced Av | 1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill windowDetails
1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill window | $105,000 |
| Apr 4, 2007 | Completed final sign-off Sep 2007 | 3124 Washington St | kitchen and bath room remodel and electrical upgrade to all 6 units, paint interior, all units the smae. no wndw or door work on the permit. kchn: atleast 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by motion sensorDetails
kitchen and bath room remodel and electrical upgrade to all 6 units, paint interior, all units the smae. no wndw or door work on the permit. kchn: atleast 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by motion sensor | $120,000 |
| Feb 21, 2007 | Completed final sign-off Jun 2007 | 2142 14th Av | remodel 1st floor by adding one new bedroom, a storage room and a bathroom.Details
remodel 1st floor by adding one new bedroom, a storage room and a bathroom. | $20,000 |
| Oct 17, 2006 | Completed final sign-off Oct 2007 | 2368 14th Av | remodel first floor existing family room, existing bath and existing storage to new family room, 2 bedrooms, 2 bathrooms. at 2/f remodel kitchen, add new bathroom, convert 1/2 bath to full bath.Details
remodel first floor existing family room, existing bath and existing storage to new family room, 2 bedrooms, 2 bathrooms. at 2/f remodel kitchen, add new bathroom, convert 1/2 bath to full bath. | $94,000 |
| Apr 8, 2004 | Never finaled issued Apr 2004, no final | 2685 22nd Av | full remodeling of bathroom and toilet room including electrical plumbing work tile change of 2 windDetails
full remodeling of bathroom and toilet room including electrical plumbing work tile change of 2 wind | $5,000 |