Back to kitchen remodel contractors
Valex Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Jul 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 96 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
51 kitchen remodel permits: 50 completed, 1 in progress. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 866 35th Av | addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry.Details
addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry. | $400,000 |
| Nov 26, 2025 | Completed final sign-off Jun 2026 | 4638 California St | remodeling of existing kitchen, bathroom, add 2nd bathroom, updrate electrical, refinish hardwood floor, painting, install washer/dryer.Details
remodeling of existing kitchen, bathroom, add 2nd bathroom, updrate electrical, refinish hardwood floor, painting, install washer/dryer. | $85,000 |
| Oct 7, 2025 | Completed final sign-off Jun 2026 | 4640 California St | remodeling of existing kitchen, bathroom, toilet room, in kind, same location, upgrade electrical, refinish hardwood floor, painting.Details
remodeling of existing kitchen, bathroom, toilet room, in kind, same location, upgrade electrical, refinish hardwood floor, painting. | $80,000 |
| May 8, 2025 | Completed final sign-off Jul 2025 | 2486 44th Av | remodel (e) kitchen: install (n) cabinets, appliances (hood, gas stove dwm, garbage disposal, fridge, faucet, sink).Details
remodel (e) kitchen: install (n) cabinets, appliances (hood, gas stove dwm, garbage disposal, fridge, faucet, sink). | $20,000 |
| Apr 24, 2024 | Completed final sign-off Oct 2024 | 2345 Turk Bl | kitchen remodel. remove wall between kitchen & dining room. replace three street facing windows at the kitchen.Details
kitchen remodel. remove wall between kitchen & dining room. replace three street facing windows at the kitchen. | $25,000 |
| Feb 15, 2024 | Completed final sign-off Sep 2024 | 1570 21st Av | remodel existing kitchen and (2) bathrooms. replace shower with toilet at 2nd bath. relocate door to lightwell.Details
remodel existing kitchen and (2) bathrooms. replace shower with toilet at 2nd bath. relocate door to lightwell. | $58,000 |
| Nov 17, 2023 | Completed final sign-off Feb 2024 | 1470 40th Av | remodeling of existing (1) kitchen and (1) bathroom on the 2/fDetails
remodeling of existing (1) kitchen and (1) bathroom on the 2/f | $36,000 |
| Sep 15, 2022 | Completed final sign-off Nov 2022 | 1834 32nd Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $24,865 |
| Jun 14, 2022 | Completed final sign-off Jan 2023 | 627 28th Av | reno of (e) kitchen on the second floor (no change in habitable area. interior works only)Details
reno of (e) kitchen on the second floor (no change in habitable area. interior works only) | $4,500 |
| May 10, 2022 | Completed final sign-off Oct 2022 | 2070 16th Av | 2/f: one kitchen remodel. remove wall between kitchen and dining room.Details
2/f: one kitchen remodel. remove wall between kitchen and dining room. | $15,000 |
| Mar 17, 2022 | Completed final sign-off Jul 2022 | 149 San Jose Av | apt #1. renovation of an exisitng kitchen (in kind).Details
apt #1. renovation of an exisitng kitchen (in kind). | $16,000 |
| Feb 11, 2022 | Completed final sign-off Dec 2023 | 573 14th Av | interior residential renovations. 2nd flor (main floor) kitchen renovations. 1st floor convert (e) storage room into (n) den & construct a (n) laundry room.Details
interior residential renovations. 2nd flor (main floor) kitchen renovations. 1st floor convert (e) storage room into (n) den & construct a (n) laundry room. | $40,000 |
| Dec 6, 2021 | Completed final sign-off Jul 2022 | 38 Stanford Heights Av | renovation of an extg kitchen and an extg bathroom, replace an extg gas fire place with new gas fireplace, new skylight.Details
renovation of an extg kitchen and an extg bathroom, replace an extg gas fire place with new gas fireplace, new skylight. | $75,000 |
| Aug 31, 2021 | Completed final sign-off Dec 2021 | 2454 Great Hy | interior kitchen remodel of 2nd floor unit. no exterior changes. no window. no hvac upgrade.Details
interior kitchen remodel of 2nd floor unit. no exterior changes. no window. no hvac upgrade. | $35,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2021 | 44 Dublin St | remodel of (e) one kitchen and one bathroom. install new cabinets, stove, hood, dwm, garbage disposal, sink, toilet, bathtub, vanity. (non-structural)Details
remodel of (e) one kitchen and one bathroom. install new cabinets, stove, hood, dwm, garbage disposal, sink, toilet, bathtub, vanity. (non-structural) | $28,000 |
| Apr 6, 2021 | Completed final sign-off Jun 2021 | 14 Springfield Dr | remodeling existing kitchen in kind and half bath in kindDetails
remodeling existing kitchen in kind and half bath in kind | $18,000 |
| Mar 2, 2021 | Completed final sign-off Jul 2021 | 3238 Balboa St | unit b, 3rd floor: 1) remodeling at existing master bath in kind 2. remodeling of existing hallbath in kind 3. remodeling of existing kitchen in kind.Details
unit b, 3rd floor: 1) remodeling at existing master bath in kind 2. remodeling of existing hallbath in kind 3. remodeling of existing kitchen in kind. | $48,000 |
| Nov 19, 2020 | Completed final sign-off Feb 2022 | 124 Otsego Av | in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyardDetails
in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyard | $28,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2021 | 1468 Sanchez St | interior remodel 1st fl - renovate bath in-kind, add closet; 2nd fl - remodel kitchen & bath, remove 2 interior load bearing walls, new patio door at rear wall, replace gas fireplace unit; 3rd fl - renovate bath in-kind. rear yard property line fence replaceDetails
interior remodel 1st fl - renovate bath in-kind, add closet; 2nd fl - remodel kitchen & bath, remove 2 interior load bearing walls, new patio door at rear wall, replace gas fireplace unit; 3rd fl - renovate bath in-kind. rear yard property line fence replace | $150,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2020 | 2387 Funston Av | 2/f remodeling of (e) kitchen.: install new cabinets countertop, dwm, g/d, gas stove, hood, fridge. install washer/dryer on the 1/f.Details
2/f remodeling of (e) kitchen.: install new cabinets countertop, dwm, g/d, gas stove, hood, fridge. install washer/dryer on the 1/f. | $18,000 |
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 242 Wawona St | remodeling of existing kitchenl install new cabinets, refrigerator, dishwasher machine, garage disposal and oven.Details
remodeling of existing kitchenl install new cabinets, refrigerator, dishwasher machine, garage disposal and oven. | $18,000 |
| Aug 22, 2019 | Completed final sign-off Oct 2019 | 528 Ortega St | kitchen remodel, in-kind, no structural work. (n) cabinets, dwm, garbage disposal, electric oven, refrigerator, hood.Details
kitchen remodel, in-kind, no structural work. (n) cabinets, dwm, garbage disposal, electric oven, refrigerator, hood. | $22,000 |
| Jun 17, 2019 | Completed final sign-off Aug 2019 | 1454 36th Av | remodeling of bathrooms(2) and kitchen (upper floor)Details
remodeling of bathrooms(2) and kitchen (upper floor) | $35,000 |
| Mar 11, 2019 | Completed final sign-off Sep 2020 | 519 Hamilton St | new bedroom, 3 fixture bath and family room addition at lower level and minor alteration to (e) kitchen wall @ upper level. also includes new deck at rear yardDetails
new bedroom, 3 fixture bath and family room addition at lower level and minor alteration to (e) kitchen wall @ upper level. also includes new deck at rear yard | $60,000 |
| Feb 25, 2019 | Completed final sign-off Nov 2019 | 404 Dellbrook Av | remodeling of existing kitchen and bathroom at upper level. update plumbing and electrical. new drywall, tile, cabinets, appliances. no change in existing floor plan.Details
remodeling of existing kitchen and bathroom at upper level. update plumbing and electrical. new drywall, tile, cabinets, appliances. no change in existing floor plan. | $25,000 |
| Oct 23, 2018 | Completed final sign-off Nov 2018 | 14 Springfield Dr | paint house inside(ceiling, walls, doors, trims, baseboard) refinish existing hardwood floor throughout entire house. . remove old drywall upgrade electrical (outlets and switches), insulation and new drywall in the livingroom and master bedroom(upstairs) replace kitchen faucet in kindDetails
paint house inside(ceiling, walls, doors, trims, baseboard) refinish existing hardwood floor throughout entire house. . remove old drywall upgrade electrical (outlets and switches), insulation and new drywall in the livingroom and master bedroom(upstairs) replace kitchen faucet in kind | $18,000 |
| May 4, 2018 | Completed final sign-off Nov 2018 | 2438 41st Av | remodel kitchen and bath. repace fireplace w/ gpa certified wood heater & comply w/ obc 3112.3Details
remodel kitchen and bath. repace fireplace w/ gpa certified wood heater & comply w/ obc 3112.3 | $98,000 |
| Apr 4, 2018 | Completed final sign-off Sep 2018 | 108 Ellsworth St | in kind. kitchen remodeling, demo old cabinets, plumbing and electrical work. install new hood, gas stove, rf, dwm, garage disp, new cabinets.Details
in kind. kitchen remodeling, demo old cabinets, plumbing and electrical work. install new hood, gas stove, rf, dwm, garage disp, new cabinets. | $16,000 |
| Apr 4, 2018 | Completed final sign-off Jun 2018 | 3854 19th St | in kind. kitchen remodeling, demo old cabinets, plumbing and electrical work. install new hood, gas stove, rf, dwm, garage disp, new cabinets.Details
in kind. kitchen remodeling, demo old cabinets, plumbing and electrical work. install new hood, gas stove, rf, dwm, garage disp, new cabinets. | $14,000 |
| Dec 13, 2017 | Completed final sign-off Jun 2018 | 71 Sanchez St | unit d: remodel of kitchen and bathroom and moving non structural wallsDetails
unit d: remodel of kitchen and bathroom and moving non structural walls | $40,000 |
| May 5, 2017 | Completed final sign-off Sep 2017 | 925 Judah St | convert single bathroom to 2 baths in each unit. new plumbing & electrical. new closet in each unit. interior remodel - create seating bar looking into the kitchen.Details
convert single bathroom to 2 baths in each unit. new plumbing & electrical. new closet in each unit. interior remodel - create seating bar looking into the kitchen. | $50,000 |
| Apr 14, 2017 | Completed final sign-off May 2017 | 1723 46th Av | revision to 201703282595 to (n) framing at 2nd level bearing wall between kitchen & living room.Details
revision to 201703282595 to (n) framing at 2nd level bearing wall between kitchen & living room. | |
| Apr 11, 2017 | Completed final sign-off Jun 2017 | 4036 Pacheco St | full remodeling of (e) kitchen & bathroom, rough & finish plumbing & electrical work surface preparation cabinetry tile work appliances, install ation no alteration of wall, windows, & doorDetails
full remodeling of (e) kitchen & bathroom, rough & finish plumbing & electrical work surface preparation cabinetry tile work appliances, install ation no alteration of wall, windows, & door | $23,000 |
| Mar 30, 2017 | Completed final sign-off May 2017 | 722 30th Av | full remodeling of existing kitchen: electrical and plumbing work, install new cabinets and appliancesDetails
full remodeling of existing kitchen: electrical and plumbing work, install new cabinets and appliances | $21,300 |
| Mar 28, 2017 | Completed final sign-off May 2017 | 1723 46th Av | full remodel kitchen. plumbing and electrical work, cabinets and appliances installationDetails
full remodel kitchen. plumbing and electrical work, cabinets and appliances installation | $12,000 |
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 1959 29th Av | remodeling of (e) kitchen.Details
remodeling of (e) kitchen. | $12,000 |
| Jul 27, 2016 | Completed final sign-off Mar 2017 | 445 Kirkham St | interior remodel to include new bathroom & new kitchen island. one exterior door ot replace existing window. repair interior stair to replace existing. new bathroom on ground floor.Details
interior remodel to include new bathroom & new kitchen island. one exterior door ot replace existing window. repair interior stair to replace existing. new bathroom on ground floor. | $95,000 |
| Mar 21, 2016 | Completed final sign-off Jul 2016 | 1901 09th Av | remodel (e) kitchen: new cabinets, new appliances(dw, ref. hood, gas stove), tile work, surface preparation.Details
remodel (e) kitchen: new cabinets, new appliances(dw, ref. hood, gas stove), tile work, surface preparation. | $12,000 |
| Feb 22, 2016 | Completed final sign-off May 2016 | 1942 16th Av | remodel kitchen; plumbing & elec. surface preparation (dry wall); cabinetrry, tiling, finishe carpentryDetails
remodel kitchen; plumbing & elec. surface preparation (dry wall); cabinetrry, tiling, finishe carpentry | $14,000 |
| Oct 13, 2015 | Completed final sign-off May 2016 | 490 33rd Av | remodeling existing kitchen(1), bathroom(2), change elec panel. install recessed lights (20) in living & bedroom. all new lights shall be led. replace (e) exh fan in bathroom. unit 204Details
remodeling existing kitchen(1), bathroom(2), change elec panel. install recessed lights (20) in living & bedroom. all new lights shall be led. replace (e) exh fan in bathroom. unit 204 | $31,000 |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 1201 06th Av | apt #6: remodeling existing bathroom (1) and kitchen (1). replace in kind. no structural work.Details
apt #6: remodeling existing bathroom (1) and kitchen (1). replace in kind. no structural work. | $15,000 |
| Oct 28, 2014 | Completed final sign-off Jan 2015 | 2250 14th Av | remodeling kitchen 8 bathrooms on 1st floor, new cabinets & appliances. new vanity, bathtub & toilet. no structural work. electrical & plumbing work.Details
remodeling kitchen 8 bathrooms on 1st floor, new cabinets & appliances. new vanity, bathtub & toilet. no structural work. electrical & plumbing work. | $31,000 |
| Aug 11, 2014 | Completed final sign-off Jan 2015 | 939 Stanyan St | remodel kitchen, update washer dryer areaDetails
remodel kitchen, update washer dryer area | $12,000 |
| Jul 18, 2013 | Completed final sign-off Jul 2014 | 2907 Folsom St | 2nd & 3rd floors (both units): reconfigure (e) kitchen, add bath, remodel (e) bath, install wooden beams & posts, upgrade elec panels, install sub-panels. ground flr: install wooden posts & conc ftgs. relocate/replace furnaces, water heaters, install lighting, replace 14 windows & 2 french doors.Details
2nd & 3rd floors (both units): reconfigure (e) kitchen, add bath, remodel (e) bath, install wooden beams & posts, upgrade elec panels, install sub-panels. ground flr: install wooden posts & conc ftgs. relocate/replace furnaces, water heaters, install lighting, replace 14 windows & 2 french doors. | $100,000 |
| May 24, 2013 | Completed final sign-off Dec 2013 | 156 Lake Merced Hill So Bl | remodeling existing kitchen (1) and bathrooms (2) change electrical serviceDetails
remodeling existing kitchen (1) and bathrooms (2) change electrical service | $18,000 |
| Feb 28, 2013 | Completed final sign-off Mar 2014 | 1726 North Point St | remodeling existing kitchen: new cabinets, new appliances, new floor (heated), electrical & plumbing workDetails
remodeling existing kitchen: new cabinets, new appliances, new floor (heated), electrical & plumbing work | $10,000 |
| Jul 10, 2009 | Completed final sign-off Sep 2009 | 1441 38th Av | kitchen & bathroom remodeling. new cabinets, new countertops, tile, new appliances. lighting kitchen 50% light watt to be high efficency. bathroom, high efficency lights or manual on occupancy sensor.Details
kitchen & bathroom remodeling. new cabinets, new countertops, tile, new appliances. lighting kitchen 50% light watt to be high efficency. bathroom, high efficency lights or manual on occupancy sensor. | $11,000 |
| Sep 12, 2008 | Completed final sign-off Mar 2009 | 1527 21st Av | remove closets in bedrooms on existing second floor. second floor improvement: construct new closet in bedroom #1. adding (2) closets and bathroom adjacent to bedroom #2. remodel kitchen. all improvements are within existing envelope.Details
remove closets in bedrooms on existing second floor. second floor improvement: construct new closet in bedroom #1. adding (2) closets and bathroom adjacent to bedroom #2. remodel kitchen. all improvements are within existing envelope. | $27,000 |
| Dec 18, 2007 | Completed final sign-off Aug 2008 | 16 Merced Av | 1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill windowDetails
1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill window | $105,000 |
| Apr 4, 2007 | Completed final sign-off Sep 2007 | 3124 Washington St | kitchen and bath room remodel and electrical upgrade to all 6 units, paint interior, all units the smae. no wndw or door work on the permit. kchn: atleast 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by motion sensorDetails
kitchen and bath room remodel and electrical upgrade to all 6 units, paint interior, all units the smae. no wndw or door work on the permit. kchn: atleast 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by motion sensor | $120,000 |
| Oct 17, 2006 | Completed final sign-off Oct 2007 | 2368 14th Av | remodel first floor existing family room, existing bath and existing storage to new family room, 2 bedrooms, 2 bathrooms. at 2/f remodel kitchen, add new bathroom, convert 1/2 bath to full bath.Details
remodel first floor existing family room, existing bath and existing storage to new family room, 2 bedrooms, 2 bathrooms. at 2/f remodel kitchen, add new bathroom, convert 1/2 bath to full bath. | $94,000 |