Permit GraphShortlistSan Francisco building permits since 2000

V S G Concrete

Contractor license
1041167
State license record
Based in
Moss Beach
On San Francisco permits
Dec 2025 to Dec 2025
Last 24 months
1 permit filed

1 permit since 2000: 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 1

1 deck permit: 1 in progress. Typically 218 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 31, 2025In progress
issued Aug 2026
339 Collingwood Stremodel (e) upper rear yard, repalce and install concrete retaining walls to support (n) raised planters. build 2 levels of wood deck with stainless steel guardrails. install (n) hot tub with electrical connection and protable propane fire feature. install (n) plants and irrigation. replace 2 (e)
Details
Permit
202512313057
Status
reinstated
Filed
Dec 31, 2025
Permit issued
Aug 6, 2026
Declared cost
$200,000
Address
339 Collingwood St

remodel (e) upper rear yard, repalce and install concrete retaining walls to support (n) raised planters. build 2 levels of wood deck with stainless steel guardrails. install (n) hot tub with electrical connection and protable propane fire feature. install (n) plants and irrigation. replace 2 (e)

Open the permit page

$200,000