Back to bathroom remodel contractors
V L L Restoration Contractor
- Based in
- Martinez
- On San Francisco permits
- Jun 2017 to Sep 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2022 | Completed final sign-off Jun 2023 | 34 Keystone Wy | amendment for existing permit# 202207067876: downstairs bathroom w/ tub for existing 1 family dwelling.(legalize bathroom)Details
amendment for existing permit# 202207067876: downstairs bathroom w/ tub for existing 1 family dwelling.(legalize bathroom) | $7,500 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 382 Madison St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $34,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2023 | 34 Keystone Wy | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $34,000 |
| Mar 3, 2022 | Completed final sign-off Sep 2022 | 55 Burlwood Dr | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $38,000 |
| Feb 9, 2022 | Completed final sign-off Jun 2022 | 174 Hale St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $34,000 |
| Jun 8, 2017 | Completed final sign-off Jan 2018 | 875 Vermont St | unit #3 new clothes w/d. removal of (e) kitchen to include cabinet replacement and removal of the wall btwn nd the living room. remodel the (e) 3 fixture bathroom. new electrical throughout the unitDetails
unit #3 new clothes w/d. removal of (e) kitchen to include cabinet replacement and removal of the wall btwn nd the living room. remodel the (e) 3 fixture bathroom. new electrical throughout the unit | $30,000 |