Back to bathroom remodel contractors
Utama Contruction Corp.
- Based in
- Hayward
- On San Francisco permits
- Jun 2009 to Mar 2018
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2018 | Expired or cancelled cancelled Jan 2026 | 2303 Lawton St | master bathroom addition. remodel extg hallbath, remodel kitchen (floor covering, fixture, cabinet and counter) new partition for extg bedroom for closet.Details
master bathroom addition. remodel extg hallbath, remodel kitchen (floor covering, fixture, cabinet and counter) new partition for extg bedroom for closet. | $48,000 |
| Dec 30, 2015 | Completed final sign-off May 2016 | 1895 Pacific Av | replace kitchen cabinet and counter. new appliances. new tile backsplash. replace bathroom vanity and counter and tiles.Details
replace kitchen cabinet and counter. new appliances. new tile backsplash. replace bathroom vanity and counter and tiles. | $10,000 |
| Sep 19, 2014 | Completed final sign-off Dec 2014 | 50 Borica St | master and hallway bath: replace tub/shower toilet and vanity, new solar tube(hallway bath) and new vent fan. new tiles floor and wall. painting. kitchen: new hardwood floor. replace caninets and countertop, light, hood,and paint. all new lights shall be high efficacy.Details
master and hallway bath: replace tub/shower toilet and vanity, new solar tube(hallway bath) and new vent fan. new tiles floor and wall. painting. kitchen: new hardwood floor. replace caninets and countertop, light, hood,and paint. all new lights shall be high efficacy. | $40,000 |