Back to bathroom remodel contractors
Ursin-Smith & Son Construction
- Based in
- Novato
- On San Francisco permits
- Jul 2009 to Feb 2016
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2009 | Never finaled issued Jul 2009, no final | 168 Palm Av | remove plaster walls insulate and replace with 5/8" type x dry wall upgrade electrical, replace showeer valve tile kitchen and bath floors, install new cabinets and counter tops "unit 4a" and "unit 4"Details
remove plaster walls insulate and replace with 5/8" type x dry wall upgrade electrical, replace showeer valve tile kitchen and bath floors, install new cabinets and counter tops "unit 4a" and "unit 4" | $30,000 |