Urbnbuild Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to May 2026
- Last 24 months
- 6 permits filed
26 permits since 2000: 19 completed, 3 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 in progress. Typically 76 days from filing to permit and 742 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2025 | In progress issued Jul 2025 | 206 Andover St | remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck sizeDetails
remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size | $1,000,000 |
| Feb 12, 2024 | Completed final sign-off Mar 2026 | 740 Tennessee St | to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement.Details
to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement. | $300,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2025 | 226 Palo Alto Av | 19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred.Details
19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred. | $350,000 |
| Mar 18, 2022 | Completed final sign-off Nov 2022 | 740 Tennessee St | revision to pa# 201901311775. interior only. remove elevator from scope of work. (n) laundry rooms at floor 2 & 4. (n) toilet room at basement. stair revisions due to site conditions.Details
revision to pa# 201901311775. interior only. remove elevator from scope of work. (n) laundry rooms at floor 2 & 4. (n) toilet room at basement. stair revisions due to site conditions. | $10,000 |