Back to bathroom remodel contractors
Upcycle Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Jul 2026
- Last 24 months
- 6 permits filed
148 permits since 2000: 108 completed, 9 in progress, 21 never finaled, 10 expired or cancelled.
Of the 21 never-finaled permits, 6 are 3 to 5 years old, 9 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 35 completed, 4 in progress, 2 never finaled, 2 expired or cancelled. Typically 9 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2025 | In progress issued Nov 2025 | 2911 Jackson St | revision to 202411084653: adding bathroom at 4th/f, remodel of e) 4th/f bathroom, addition of 4th/f wet bar. replace 25 windows on 3rd & 4th fl, like for like on jackson st.Details
revision to 202411084653: adding bathroom at 4th/f, remodel of e) 4th/f bathroom, addition of 4th/f wet bar. replace 25 windows on 3rd & 4th fl, like for like on jackson st. | $99,000 |
| Apr 18, 2025 | In progress issued Apr 2025 | 2334 Lake St | convert (e) workshop area @ garage level into wetbar, bath, and guest suite. no building envelope changeDetails
convert (e) workshop area @ garage level into wetbar, bath, and guest suite. no building envelope change | $70,000 |
| Mar 27, 2025 | In progress issued Dec 2025 | 956 Noe St | remodel 1st & 2nd fl (remodel 1 kitchen, 1 bath, add 1.5 bath), no change use/envelope or front facade, replace windows in-kind. e) rear balcony: lower deck level w/ e) enelope & replace railing. expand rear deck (18" above grade) mech sep permit.Details
remodel 1st & 2nd fl (remodel 1 kitchen, 1 bath, add 1.5 bath), no change use/envelope or front facade, replace windows in-kind. e) rear balcony: lower deck level w/ e) enelope & replace railing. expand rear deck (18" above grade) mech sep permit. | $600,000 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| Feb 4, 2020 | Never finaled issued Nov 2021, no final | 4567 19th St | remodel of (e) two story sf with vertical & horizontal expansion,(n)entry,bedroom, bath on 1st fl,2nd fl relocate master suite w/(n) bath/closet,reconfigure two(e) bedrooms w/bath ensuite.new office,playroom & laundry, relocate kitchen & living room to (n)3rd fl w/ access to rear deck & yardDetails
remodel of (e) two story sf with vertical & horizontal expansion,(n)entry,bedroom, bath on 1st fl,2nd fl relocate master suite w/(n) bath/closet,reconfigure two(e) bedrooms w/bath ensuite.new office,playroom & laundry, relocate kitchen & living room to (n)3rd fl w/ access to rear deck & yard | $454,036 |
| Jul 2, 2019 | Completed final sign-off Jan 2020 | 2651 Green St | demo & replace 2 (e) bathrooms w/finishes & fixtures in-kind. no wall demo. replace roofing @ various front & rear elevation locations & in light well. front elevation: copper @ small roof off 3/f deck & over bay at 3/f to correct (e) negative slope. remove/reinstall decking rear for new roofing.Details
demo & replace 2 (e) bathrooms w/finishes & fixtures in-kind. no wall demo. replace roofing @ various front & rear elevation locations & in light well. front elevation: copper @ small roof off 3/f deck & over bay at 3/f to correct (e) negative slope. remove/reinstall decking rear for new roofing. | $230,000 |
| May 29, 2019 | Never finaled issued May 2019, no final | 34 Clarendon Av | revision to 200806124307, 200804169875, 201702099036, remove from scope: kitchen work, 2nd, fl powder rm, 1st fl bath except skylight in fill, opening at 2nd fl stairs. remove from scope new exterior sump pump relocate replace, add new galvy sq bar railing at e exterior stairs and landing. clarify eDetails
revision to 200806124307, 200804169875, 201702099036, remove from scope: kitchen work, 2nd, fl powder rm, 1st fl bath except skylight in fill, opening at 2nd fl stairs. remove from scope new exterior sump pump relocate replace, add new galvy sq bar railing at e exterior stairs and landing. clarify e | |
| Sep 18, 2018 | Completed final sign-off Jan 2019 | 2090 Vallejo St | revision to 201805169299 new opening btw liv rm 101 and fam rm 102. revision to master bathroom 202. removal of shower at bathroom 209 & proposed new linen closet rm & door at 2nd maher naDetails
revision to 201805169299 new opening btw liv rm 101 and fam rm 102. revision to master bathroom 202. removal of shower at bathroom 209 & proposed new linen closet rm & door at 2nd maher na | $7,500 |
| Aug 31, 2018 | Expired or cancelled expired Mar 2026 | 917 Bush St | interior restaurant t.i. scope includes new seating, new kitchen, new all gender ada bathroom. no exterior work. mep shall be design build under separate permit.Details
interior restaurant t.i. scope includes new seating, new kitchen, new all gender ada bathroom. no exterior work. mep shall be design build under separate permit. | $101,650 |
| Jul 10, 2018 | Completed final sign-off Sep 2020 | 426 Jersey St | add a 3/f to (e) 2story bldg, 2 story horizontal extension incl. 2/f & 3/f decks. renovation of entire bldg, (n) stairway & addition of master bedrm & bath. another bedrm & bath on the 3/f to accommodate a family of four, fully 13r sprinkler. in an otherwise 2 story tight . quarters.**maher n/a**.Details
add a 3/f to (e) 2story bldg, 2 story horizontal extension incl. 2/f & 3/f decks. renovation of entire bldg, (n) stairway & addition of master bedrm & bath. another bedrm & bath on the 3/f to accommodate a family of four, fully 13r sprinkler. in an otherwise 2 story tight . quarters.**maher n/a**. | $670,000 |
| Mar 22, 2018 | Completed final sign-off Aug 2018 | 3045 Jackson St | bathroom remodel, repalce finishes, like for like, now walls moved, removed, added or infilled , all (e) layouts to remain unchangedDetails
bathroom remodel, repalce finishes, like for like, now walls moved, removed, added or infilled , all (e) layouts to remain unchanged | $50,000 |
| Feb 16, 2018 | Completed final sign-off Aug 2018 | 3045 Jackson St | kitchen and bath renovation. replace finishes like for likeDetails
kitchen and bath renovation. replace finishes like for like | $50,000 |
| Nov 9, 2017 | Expired or cancelled cancelled Jan 2026 | 227 Front St | revision to pa#201706199690, bathroom doors to be free swinging with no locks, latches or closers. n/a ordinance #155-13Details
revision to pa#201706199690, bathroom doors to be free swinging with no locks, latches or closers. n/a ordinance #155-13 | |
| Jan 5, 2017 | Completed final sign-off Mar 2018 | 170 Pacific Av | unit #31: remodel kitchen and bathrooms, removing and replacing electrical fixtures, cabinets, doors and flooring.Details
unit #31: remodel kitchen and bathrooms, removing and replacing electrical fixtures, cabinets, doors and flooring. | $75,000 |
| Aug 22, 2016 | Completed final sign-off Aug 2017 | 135 15th Av | new fixed curb mounted skylight above bathroom. u value of no more than 0.32.Details
new fixed curb mounted skylight above bathroom. u value of no more than 0.32. | $1,000 |
| Feb 1, 2016 | Completed final sign-off Dec 2016 | 65 Pearl St | remodel of extg kitchen and extg bathroom. adding new stair to connect extg ground floor and extg 2nd floor.Details
remodel of extg kitchen and extg bathroom. adding new stair to connect extg ground floor and extg 2nd floor. | $45,000 |
| Sep 18, 2015 | Completed final sign-off Nov 2016 | 552 Arkansas St | revision to app#201505146396. change ceiling ht's at 1st floor bedroom, bath closet to 8'-0" underpin extg foundations at north wall west end and south wall west end.Details
revision to app#201505146396. change ceiling ht's at 1st floor bedroom, bath closet to 8'-0" underpin extg foundations at north wall west end and south wall west end. | $1,000 |
| Jun 12, 2015 | Completed final sign-off Sep 2017 | 135 15th Av | rear horizonatal expansion, remodel kitchen & 1-full bath, expansion of occupied area @ garage level.Details
rear horizonatal expansion, remodel kitchen & 1-full bath, expansion of occupied area @ garage level. | $600,000 |
| May 14, 2015 | Completed final sign-off Nov 2016 | 552 Arkansas St | new communicating stair between 1st and 2nd floors, new master bedroom, storage, master bath at 1st floor. 2 new windows at 1st floor level of new facade. voluntary strengthening.Details
new communicating stair between 1st and 2nd floors, new master bedroom, storage, master bath at 1st floor. 2 new windows at 1st floor level of new facade. voluntary strengthening. | $115,000 |
| Apr 22, 2015 | Completed final sign-off Sep 2018 | 3955 19th St | replacing non-conforming roof deck with new roof deck with stair. interior remodel of an extg residential home. the scope of the work includes kitchen, bathroom, electrical, plumbing upgrades, and remodeling.Details
replacing non-conforming roof deck with new roof deck with stair. interior remodel of an extg residential home. the scope of the work includes kitchen, bathroom, electrical, plumbing upgrades, and remodeling. | $160,000 |
| Mar 13, 2015 | Completed final sign-off Aug 2015 | 1925 Pacific Av | #6: renovate kitchen, 2 baths, in existing locations. no wall alterations. paint, refinish floor, lighting upgrades, no structural/na maher ord. # 155-13Details
#6: renovate kitchen, 2 baths, in existing locations. no wall alterations. paint, refinish floor, lighting upgrades, no structural/na maher ord. # 155-13 | $50,000 |
| Oct 23, 2014 | Completed final sign-off Jun 2015 | 512 Vallejo St | unit 512: interior remodel of (e) kitchen, dining room, & bath; unit 516: interior remodel of (e) kitchen, dining room, & bath.Details
unit 512: interior remodel of (e) kitchen, dining room, & bath; unit 516: interior remodel of (e) kitchen, dining room, & bath. | $120,000 |
| Oct 23, 2014 | Completed final sign-off Feb 2015 | 10 South Park | bath renovation. minor lighting upgrades, kitchen appliances, cooker hoodDetails
bath renovation. minor lighting upgrades, kitchen appliances, cooker hood | $25,000 |
| Aug 26, 2014 | Completed final sign-off Dec 2014 | 3045 Jackson St | #103: bathroom renovation: replace (e) fixtures in (e) locations; replace drywall and tile; electrical upgrades. replace kitchen countertops; paint cabinets; replace (e) dining room swinging doors with (n) pocket doors. no structural or wall changes. n/a maher ordinance #155-13Details
#103: bathroom renovation: replace (e) fixtures in (e) locations; replace drywall and tile; electrical upgrades. replace kitchen countertops; paint cabinets; replace (e) dining room swinging doors with (n) pocket doors. no structural or wall changes. n/a maher ordinance #155-13 | $40,000 |
| Jul 25, 2014 | Completed final sign-off Dec 2015 | 690 Market St | #2005:replace powder room w/new full bathroom w/shower stall; convert (e) master closet to study, add murphy bed w/enclosure; add 2 (n) master bedroom closets; replace (e) tile and hardwood floor w/eng hardwood; replace & installDetails
#2005:replace powder room w/new full bathroom w/shower stall; convert (e) master closet to study, add murphy bed w/enclosure; add 2 (n) master bedroom closets; replace (e) tile and hardwood floor w/eng hardwood; replace & install | $80,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 3565 Sacramento St | renovate 2 bathrooms: no change layout. replace fixtures in extg locations. add laundry service at extg closet. add non-structural wall, add washer & dryer, including proper mechanical (vent, fan, combust air) and plmg. other repairs:refinish floors, elec, upgrade, paint. add tankless water heater.Details
renovate 2 bathrooms: no change layout. replace fixtures in extg locations. add laundry service at extg closet. add non-structural wall, add washer & dryer, including proper mechanical (vent, fan, combust air) and plmg. other repairs:refinish floors, elec, upgrade, paint. add tankless water heater. | $50,000 |
| Mar 20, 2014 | Completed final sign-off Aug 2014 | 1622 Folsom St | tenant improvement. upgrade front entrance door latch to accessible. upgrade bathroom to full accessible. n/a for the mahar ordinance #155-13Details
tenant improvement. upgrade front entrance door latch to accessible. upgrade bathroom to full accessible. n/a for the mahar ordinance #155-13 | $7,000 |
| Mar 20, 2014 | Completed final sign-off Jun 2015 | 37 Clipper St | 1st fl renovation: (n) bath, mech & family rm. 1st fl rear addition: (n) bedrm. 3rd fl remodel: bath,hall & master dressing rm. (n) aluminum clad wood windows @ rear facaes per drawings. (n) gas-fired furnace & high efficiency water heater w/ (n) distribution as req'd.Details
1st fl renovation: (n) bath, mech & family rm. 1st fl rear addition: (n) bedrm. 3rd fl remodel: bath,hall & master dressing rm. (n) aluminum clad wood windows @ rear facaes per drawings. (n) gas-fired furnace & high efficiency water heater w/ (n) distribution as req'd. | $235,000 |
| Jan 14, 2014 | Completed final sign-off Aug 2014 | 113 Lundys Ln | add a bathroom and bedroom. remodel kitchen. new windows and door at rear yardDetails
add a bathroom and bedroom. remodel kitchen. new windows and door at rear yard | $52,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2015 | 37 Clipper St | infill of bathroom window and installation of ceiling exhaust fan w/ ventillation as required.Details
infill of bathroom window and installation of ceiling exhaust fan w/ ventillation as required. | $5,000 |
| Dec 11, 2013 | Completed final sign-off Dec 2014 | 804 Dolores St | revision to 201309207340, new roof deck for private use of upper unit. replace in kind exterior egress stairs at rear yard, reconfigure previously approved bath and laundry remodl, dry rot repair at 3rd fl lightwell walls and windowsDetails
revision to 201309207340, new roof deck for private use of upper unit. replace in kind exterior egress stairs at rear yard, reconfigure previously approved bath and laundry remodl, dry rot repair at 3rd fl lightwell walls and windows | $55,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2015 | 150 Lexington St | unit #3: remodel 3rd level condo. new fixtures, cabinets at bath and kitchen. revise non structural partitions. limited structural revisions. exterior door and window revisions. any revision to existing fire sprinklers under seperate permit.Details
unit #3: remodel 3rd level condo. new fixtures, cabinets at bath and kitchen. revise non structural partitions. limited structural revisions. exterior door and window revisions. any revision to existing fire sprinklers under seperate permit. | $50,000 |
| Sep 20, 2013 | Completed final sign-off Dec 2014 | 804 Dolores St | interior remodel of top unit at 3rd fl. kitcchen remodel. relocate laundry, bath remodel, new bath, new stairs from upper unit to unoccupied roof. new skylightsDetails
interior remodel of top unit at 3rd fl. kitcchen remodel. relocate laundry, bath remodel, new bath, new stairs from upper unit to unoccupied roof. new skylights | $70,000 |
| Aug 15, 2013 | Completed final sign-off Nov 2014 | 2683 Pine St | voluntary plywood stiffening at garage level only (no calcs, no special inspections). installation of 2 new skykights. 2.5 bath and 1 kitchen remodel (on 1st and 2nd fl.) replace furnaces, water heater, doors. existing window sash to remain. replace glazing only on windows facing street.Details
voluntary plywood stiffening at garage level only (no calcs, no special inspections). installation of 2 new skykights. 2.5 bath and 1 kitchen remodel (on 1st and 2nd fl.) replace furnaces, water heater, doors. existing window sash to remain. replace glazing only on windows facing street. | $45,000 |
| Aug 5, 2013 | Completed final sign-off Feb 2014 | 2596 Chestnut St | interior: conversion of portion of ground floor garage to bedroom with closet, bathroom, foyer/entry, vestibule, hall laundry closet. exterior: patch and repair facade as needed. new skim coat at third floor south facade, third floor west facade, second floor west facade replacement of stucco at 2ndDetails
interior: conversion of portion of ground floor garage to bedroom with closet, bathroom, foyer/entry, vestibule, hall laundry closet. exterior: patch and repair facade as needed. new skim coat at third floor south facade, third floor west facade, second floor west facade replacement of stucco at 2nd | $22,000 |
| Jun 25, 2013 | Completed final sign-off Nov 2013 | 3045 Jackson St | apt 202: bathroom renovation in existing space. no structural or wall changes. new lighting and plumbing fixtures, installation of exhaust fan. installation of built in cabinetry in adjacent closet. all lighting to be high efficiency led.Details
apt 202: bathroom renovation in existing space. no structural or wall changes. new lighting and plumbing fixtures, installation of exhaust fan. installation of built in cabinetry in adjacent closet. all lighting to be high efficiency led. | $30,000 |
| Nov 30, 2012 | Completed final sign-off Oct 2013 | 2683 Pine St | remove drywall, lath, plaster & fixtures from kitchen, 2 baths, 1 1/2 bath. no other work, all interior, no framing to be removed. demolition only, all construction to be performed under other permit.Details
remove drywall, lath, plaster & fixtures from kitchen, 2 baths, 1 1/2 bath. no other work, all interior, no framing to be removed. demolition only, all construction to be performed under other permit. | $10,000 |
| Aug 2, 2012 | Completed final sign-off Mar 2013 | 155 Teresita Bl | remodel 1st floor storage area into family room, study, bathroom. add deck & stairs at rear yardDetails
remodel 1st floor storage area into family room, study, bathroom. add deck & stairs at rear yard | $64,000 |
| May 21, 2012 | Completed final sign-off Apr 2013 | 63 Digby St | remodel kitchen and bath. replace 10 windows, 2 sliding glass doors,one skylight, add new skylight. 2 sliding doors at 2nd floor, remodel master bathroomDetails
remodel kitchen and bath. replace 10 windows, 2 sliding glass doors,one skylight, add new skylight. 2 sliding doors at 2nd floor, remodel master bathroom | $34,000 |
| Jan 24, 2012 | Completed final sign-off Nov 2012 | 3045 Jackson St | unit # 304: kitchen and bath renovation. no structural work.Details
unit # 304: kitchen and bath renovation. no structural work. | $30,000 |
| Jan 31, 2011 | Completed final sign-off Mar 2011 | 755 Oak St | bath improvements, replace tub, shower head, valve, toilet, 2nd sink, same locations, new exhaust fan unit, repair some drywall, 2 new light fixutres, tile, floor covering. no structural. exhaust fan to terminate outside min clear 3' from bldg openings. high eff lights mor manual on occupancy sensorDetails
bath improvements, replace tub, shower head, valve, toilet, 2nd sink, same locations, new exhaust fan unit, repair some drywall, 2 new light fixutres, tile, floor covering. no structural. exhaust fan to terminate outside min clear 3' from bldg openings. high eff lights mor manual on occupancy sensor | $8,000 |
| Jan 20, 2011 | Completed final sign-off Jun 2012 | 2454 40th Av | fill in under extg 2nd floor extension build out of some space in garage. add playroom, study room and bathroom. repace stair.Details
fill in under extg 2nd floor extension build out of some space in garage. add playroom, study room and bathroom. repace stair. | $45,000 |
| Dec 6, 2010 | Completed final sign-off Jan 2011 | 1759 Alabama St | bathroom remodel: no structural, o doors or windows,new glass door & panels for shower. electrical: replace 2 recessed light fixtures in (e)locations. plubing: (e)shower to remai, re-waterproof & re-tile, relocate showerhead & mising valve. hvac: relcoate one forced air vent to new location (bath)Details
bathroom remodel: no structural, o doors or windows,new glass door & panels for shower. electrical: replace 2 recessed light fixtures in (e)locations. plubing: (e)shower to remai, re-waterproof & re-tile, relocate showerhead & mising valve. hvac: relcoate one forced air vent to new location (bath) | $10,000 |