Upcycle Builders
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Mar 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2009 | Completed final sign-off Dec 2010 | 150 Lexington St | bathroom:1)replace extg bathtub wth similar in same place. drain, mixing valve and shower head to be moved slightly, but to remain on same wall. 2) replace extg vanity with similar, in same place. new sink to be installed, but no plmg other then connecting new sink and fuacet.3)new tile on floorDetails
bathroom:1)replace extg bathtub wth similar in same place. drain, mixing valve and shower head to be moved slightly, but to remain on same wall. 2) replace extg vanity with similar, in same place. new sink to be installed, but no plmg other then connecting new sink and fuacet.3)new tile on floor | $5,000 |