Back to bathroom remodel contractors
Unique Home Design & Remodeling
- Based in
- Redwood City
- On San Francisco permits
- Aug 2020 to Apr 2026
- Last 24 months
- 5 permits filed
14 permits since 2000: 12 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 in progress. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2026 | Completed final sign-off May 2026 | 3663 Clay St | bathroom remodeling like for like. updating all finishes including floor, vanity, shower, painting, no location changes.Details
bathroom remodeling like for like. updating all finishes including floor, vanity, shower, painting, no location changes. | $20,500 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 222 Madrid St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s). | $35,000 |
| May 29, 2025 | Completed final sign-off Jul 2026 | 610 Rhode Island St | rev to pa# 2025-0310-1878: remodel bathroom and add new bathroomDetails
rev to pa# 2025-0310-1878: remodel bathroom and add new bathroom | $25,000 |
| Mar 10, 2025 | In progress issued Apr 2025 | 610 Rhode Island St | 2/f: one full bathroom added and shower added to (e) half bath. no exterior work.Details
2/f: one full bathroom added and shower added to (e) half bath. no exterior work. | $30,000 |
| Sep 20, 2023 | Completed final sign-off Mar 2024 | 37 Cragmont Av | hallway bath remodel like for like. tub to shower, replace plumbing fixtures, update e/m/p up to code. master bath remodeling. relocate toilet, shower and tub. enlarge closet, replace pocket door.Details
hallway bath remodel like for like. tub to shower, replace plumbing fixtures, update e/m/p up to code. master bath remodeling. relocate toilet, shower and tub. enlarge closet, replace pocket door. | $28,000 |
| Aug 1, 2023 | Completed final sign-off Nov 2023 | 1130 Church St | convert (1) bathroom to (2) bathrooms,l new shower, toilet & singk, add new recessed lights, fanDetails
convert (1) bathroom to (2) bathrooms,l new shower, toilet & singk, add new recessed lights, fan | $40,000 |
| Jul 22, 2022 | Completed final sign-off May 2023 | 368 Cresta Vista Dr | remodeling 2 bathrooms like for like replace all plumbing fixtures; electrical , replace fan, add new r.l. replace 1 tub; 1 kitchen remodeling. replace all appliances & fixturs. new main service. rewire entire house. no new wall & no (e) wall relocation. new lighting comply w/cec 150.0 (k)3 & (k)5Details
remodeling 2 bathrooms like for like replace all plumbing fixtures; electrical , replace fan, add new r.l. replace 1 tub; 1 kitchen remodeling. replace all appliances & fixturs. new main service. rewire entire house. no new wall & no (e) wall relocation. new lighting comply w/cec 150.0 (k)3 & (k)5 | $45,000 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 1470 Golden Gate Av | master bathroom like for like, new vanity, sink, medicine cabinet, 2 outlet, 2 recess lights, guest bathroom vanity, replace door 3 outlets, 2 recess , 1 tub. all bathroom bring up to code electric plumbing.Details
master bathroom like for like, new vanity, sink, medicine cabinet, 2 outlet, 2 recess lights, guest bathroom vanity, replace door 3 outlets, 2 recess , 1 tub. all bathroom bring up to code electric plumbing. | $15,000 |
| Aug 4, 2020 | Completed final sign-off Aug 2020 | 85 Duboce Av | unit# 202: bathroom remodel install, replace new shower head, new toilet replacement, replace exhaust fan in bathroom. add 2 new recess light in the bathroom. all work in kind. no structural work under this permit.Details
unit# 202: bathroom remodel install, replace new shower head, new toilet replacement, replace exhaust fan in bathroom. add 2 new recess light in the bathroom. all work in kind. no structural work under this permit. | $22,000 |