Back to bathroom remodel contractors
Union Pierce Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Feb 2026
- Last 24 months
- 4 permits filed
34 permits since 2000: 12 completed, 5 in progress, 16 never finaled, 1 expired or cancelled.
Of the 16 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 3 never finaled. Typically 43 days from filing to permit and 493 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2018 | Never finaled issued Feb 2019, no final | 1030 Leavenworth St | foundation upgrade to existing basement level. excavation and expansion of existing wine cellar. minor remodel to existing bath, re-frame existing stair to 1st level.Details
foundation upgrade to existing basement level. excavation and expansion of existing wine cellar. minor remodel to existing bath, re-frame existing stair to 1st level. | $60,000 |
| Nov 22, 2017 | Never finaled issued Dec 2019, no final | 57 Ashbury Tr | upgrade to fixtures and finishes in kitchen and 2nd floor bath. replacement of select windows. variance for half bath addition to side yard (adjacent to kitchen) and legalize (e) rear yard stucture (writing room)Details
upgrade to fixtures and finishes in kitchen and 2nd floor bath. replacement of select windows. variance for half bath addition to side yard (adjacent to kitchen) and legalize (e) rear yard stucture (writing room) | $100,000 |
| Oct 31, 2017 | Completed final sign-off Mar 2019 | 55 Ashbury Tr | revision to 201708104503: new skylight in bathroom, new fire rated window in master bath.Details
revision to 201708104503: new skylight in bathroom, new fire rated window in master bath. | $20,000 |
| Aug 10, 2017 | Completed final sign-off Mar 2019 | 55 Ashbury Tr | interior remodel of 3/f, add new bathroom. replace (e) front facade wood windows and doors in kind.Details
interior remodel of 3/f, add new bathroom. replace (e) front facade wood windows and doors in kind. | $140,000 |
| Mar 13, 2014 | Never finaled issued Apr 2014, no final | 55 Ashbury Tr | interior remodel of 1st floor extg habitable space(bath, rec room, laundry, storage) replace 4 extg fenestration, , replace exterior structural posts. exterior landscape remodel. replace extg lower deck and stair with in extg footprint. reduce extg footprint of extg upper deck.Details
interior remodel of 1st floor extg habitable space(bath, rec room, laundry, storage) replace 4 extg fenestration, , replace exterior structural posts. exterior landscape remodel. replace extg lower deck and stair with in extg footprint. reduce extg footprint of extg upper deck. | $65,000 |
| Apr 19, 2013 | Completed final sign-off Sep 2013 | 4909 17th St | 95 sq. ft. bathroom remodel, move toilet, install 2 lav vanity, install new shower valve fixture, install (3 recessed lv cans, new sheetrock and porcelain tile on floor and tub surround. reglaze tub (remodel bathroom - same location)Details
95 sq. ft. bathroom remodel, move toilet, install 2 lav vanity, install new shower valve fixture, install (3 recessed lv cans, new sheetrock and porcelain tile on floor and tub surround. reglaze tub (remodel bathroom - same location) | $16,000 |