Back to bathroom remodel contractors
Unik Creations
- Based in
- El Sobrante
- On San Francisco permits
- Jun 2008 to Sep 2015
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 4 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2015 | Completed final sign-off Jul 2015 | 106 Jules Av | replace 2 windows: 1 window at bathroom and 1 window at kitchen. windows are vinyl double hung, same size and location, and not visible from street. u-factor for all windows replacement shall not exceed 0.32.Details
replace 2 windows: 1 window at bathroom and 1 window at kitchen. windows are vinyl double hung, same size and location, and not visible from street. u-factor for all windows replacement shall not exceed 0.32. | $1,600 |
| Jun 12, 2008 | Completed final sign-off Nov 2008 | 2426 15th St | construct a dividing wall between the entryway and the ex. workshop, install new bath, 6 new outlets, 6 new ceiling lights and a utility sink in the ex. basement level.Details
construct a dividing wall between the entryway and the ex. workshop, install new bath, 6 new outlets, 6 new ceiling lights and a utility sink in the ex. basement level. | $18,500 |