Back to bathroom remodel contractors
Umlaut Interiors Llc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Sep 2026
- Last 24 months
- 7 permits filed
19 permits since 2000: 10 completed, 3 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 in progress, 1 expired or cancelled. Typically 5 days from filing to permit and 289 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 135 Pacheco St | 2/f - remodel of (e) bathroom, all in kind. no exterior work. shower over tub, vanity, toilet, and tile.Details
2/f - remodel of (e) bathroom, all in kind. no exterior work. shower over tub, vanity, toilet, and tile. | $20,000 |
| Nov 15, 2024 | Expired or cancelled expired Sep 2026 | 11 Mars St | remodel kitchen on 3rd fl. new 1/2 bath on 3rd fl. remove wall bwt kitchen & living rm on 3rd fl. no exterior workDetails
remodel kitchen on 3rd fl. new 1/2 bath on 3rd fl. remove wall bwt kitchen & living rm on 3rd fl. no exterior work | $29,050 |
| Nov 6, 2023 | Completed final sign-off Aug 2024 | 135 Pacheco St | remodel 1 (e) kitchen & 1 (e) bathroom in kindDetails
remodel 1 (e) kitchen & 1 (e) bathroom in kind | $50,000 |
| Sep 26, 2023 | Completed final sign-off Nov 2023 | 152 Fairmount St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $10,600 |
| May 3, 2021 | Completed final sign-off Sep 2022 | 741 Oak St | remodel kitchens & bathrooms in both units. new plan configuration at ground floor. add 84 sqft habitable space. new window & french door at rear wall. not visible from street.Details
remodel kitchens & bathrooms in both units. new plan configuration at ground floor. add 84 sqft habitable space. new window & french door at rear wall. not visible from street. | $160,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2021 | 160 Harvard St | remodel of existing bathroom.Details
remodel of existing bathroom. | $5,000 |
| Sep 2, 2020 | Completed final sign-off Sep 2022 | 1479 Shotwell St | remodel 2nd story to create 3 bathrooms and 4 bedrooms. remodel ground level storage space to include kitchen and family rom. no proposed exterior changes.Details
remodel 2nd story to create 3 bathrooms and 4 bedrooms. remodel ground level storage space to include kitchen and family rom. no proposed exterior changes. | $95,000 |