Back to bathroom remodel contractors
Umanzor Construction Inc.
- Based in
- South San Francisco
- On San Francisco permits
- May 2009 to Jul 2023
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 30 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2023 | Completed final sign-off Jun 2023 | 2031 Oakdale Av | correct nov 202286782. correct rear door & landing. relocate egress window obtructed by stairway stringer @ lower fl. repair rear stair stringers, correct landing @ lower fl exit. remove parition wall in 2nd fl bathroom. close a 2nd access doorDetails
correct nov 202286782. correct rear door & landing. relocate egress window obtructed by stairway stringer @ lower fl. repair rear stair stringers, correct landing @ lower fl exit. remove parition wall in 2nd fl bathroom. close a 2nd access door | $7,500 |
| Dec 12, 2019 | Completed final sign-off Jul 2020 | 2455 44th Av | 2nd fl remodel kitchen and bath. relplace all interior wiring and overhead plumbing for the kitchen and bath, replace cabinets. gr fl remodel electrical for 2 bedrooms, full bath, storage, remove wetbar.Details
2nd fl remodel kitchen and bath. relplace all interior wiring and overhead plumbing for the kitchen and bath, replace cabinets. gr fl remodel electrical for 2 bedrooms, full bath, storage, remove wetbar. | $35,000 |
| Jun 14, 2017 | Completed final sign-off Dec 2017 | 1314 Thomas Av | remodel kitchen & bathroom, relocate toilet, remove tub and install shower, install washer & dryer connection, replace kitchen cabinet, relocate stove, install dishwasher.Details
remodel kitchen & bathroom, relocate toilet, remove tub and install shower, install washer & dryer connection, replace kitchen cabinet, relocate stove, install dishwasher. | $12,000 |
| Feb 5, 2015 | Expired or cancelled expired Jun 2018 | 1776 Revere Av | adding 2 bedrooms on g/f and 1 bath.Details
adding 2 bedrooms on g/f and 1 bath. | $20,000 |