Tyken Construction
- Based in
- San Mateo
- On San Francisco permits
- Oct 2013 to Apr 2019
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2015 | Completed final sign-off Apr 2015 | 767 Oak St | bathroom renovation. amendment to original app#201411242334. move wall out by 16"Details
bathroom renovation. amendment to original app#201411242334. move wall out by 16" | $6,000 |
| Nov 24, 2014 | Completed final sign-off Apr 2015 | 767 Oak St | bathroom renovation at ground floor: remove existing tub, vanity, toilet, install new tub, shower stall, vanity, toilet. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
bathroom renovation at ground floor: remove existing tub, vanity, toilet, install new tub, shower stall, vanity, toilet. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $6,000 |