Twinwood Development Inc
- Based in
- Concord
- On San Francisco permits
- Apr 2013 to Jul 2025
- Last 24 months
- 3 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Oct 2025 | 649 04th Av | revision to permit 202506189043. remove kitchen window and wall-in opening.Details
revision to permit 202506189043. remove kitchen window and wall-in opening. | $2,000 |
| Jun 18, 2025 | Completed final sign-off Oct 2025 | 649 04th Av | laundry, kitchen and bath remodel, enlarge opening in dining room. door to bedroom from family room. no exterior work.Details
laundry, kitchen and bath remodel, enlarge opening in dining room. door to bedroom from family room. no exterior work. | $50,000 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 649 04th Av | replace 6 windows - window frame box to remain. street facing windows. aluminum clad. all single hung windown. no rough open iong changes. u-factor for all new windows shall not exceed 0.30.Details
replace 6 windows - window frame box to remain. street facing windows. aluminum clad. all single hung windown. no rough open iong changes. u-factor for all new windows shall not exceed 0.30. | $4,000 |
| Mar 9, 2022 | Completed final sign-off Mar 2026 | 562 Market St | revision to pa# 202002275634. proposed change of interior non-rated partition finish from 2 sides to interior side only. changes to lighting layout. no changes to proposed exit. see approved permit for accessibility features.Details
revision to pa# 202002275634. proposed change of interior non-rated partition finish from 2 sides to interior side only. changes to lighting layout. no changes to proposed exit. see approved permit for accessibility features. | |
| Feb 27, 2020 | Completed final sign-off Dec 2022 | 562 Market St | 00ground floor t.i. including partitions, finishes, equipment, new type 1 exhuast hood. extg handicapped accessible restroom to remain. extg storefront to remain. sign letters under seperate permit.Details
00ground floor t.i. including partitions, finishes, equipment, new type 1 exhuast hood. extg handicapped accessible restroom to remain. extg storefront to remain. sign letters under seperate permit. | $135,000 |
| Feb 27, 2020 | Never finaled issued Feb 2021, no final | 562 Market St | to erect non electrical sign letters(chicken and rice)Details
to erect non electrical sign letters(chicken and rice) | $1,200 |
| Nov 7, 2014 | Completed final sign-off Mar 2015 | 2119 26th Av | interior remodel of ground level and addition of deck at ground level. relocation of bathroom and sink. revision to app#201304305750Details
interior remodel of ground level and addition of deck at ground level. relocation of bathroom and sink. revision to app#201304305750 | |
| Apr 30, 2013 | Completed final sign-off Mar 2015 | 2119 26th Av | inteiror remodel of an unconditioned space includes office and media & bathroom at ground floor. remodel oa an (e) exterior rear deck, addition of a rear stair to yard.Details
inteiror remodel of an unconditioned space includes office and media & bathroom at ground floor. remodel oa an (e) exterior rear deck, addition of a rear stair to yard. | $30,000 |