Back to bathroom remodel contractors
Turbo Construction
- Based in
- Pacifica
- On San Francisco permits
- Mar 2025 to Sep 2026
- Last 24 months
- 13 permits filed
13 permits since 2000: 4 completed, 8 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 2 completed, 4 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | Expired or cancelled cancelled Jun 2026 | 146 Ralston St | bathroom remodel, new toilet, new vanity, new lights, new tiles.Details
bathroom remodel, new toilet, new vanity, new lights, new tiles. | $28,000 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 540 Lake St | unit #4: kitchen and bath room remodel. add new subpanel. replace sink and electrical. replace existing shower pan.Details
unit #4: kitchen and bath room remodel. add new subpanel. replace sink and electrical. replace existing shower pan. | $25,000 |
| Sep 8, 2025 | In progress issued Sep 2025 | 37 San Jacinto Wy | 1st/f: add entertainment rm w/wet bar, 1 bedroom & 1 full bath. 2nd/f: remodel e) kitchen, dining, family rm & powder rm. 3rd fl: reconfigure e) bedrooms & bathrooms. replace deck in kind at rear & new patio on grade at lower yardDetails
1st/f: add entertainment rm w/wet bar, 1 bedroom & 1 full bath. 2nd/f: remodel e) kitchen, dining, family rm & powder rm. 3rd fl: reconfigure e) bedrooms & bathrooms. replace deck in kind at rear & new patio on grade at lower yard | $168,000 |
| Aug 12, 2025 | In progress issued Aug 2025 | 3745 Geary Bl | (1) kitchen and (2) bathroom remodel. no layout changes. replace (6) windows in-kind not street facing.Details
(1) kitchen and (2) bathroom remodel. no layout changes. replace (6) windows in-kind not street facing. | $40,000 |
| Jun 26, 2025 | In progress issued Jun 2026 | 2315 17th Av | 2/f remodel kitchen and bathroom, add 1 full bath, infill lightwell.Details
2/f remodel kitchen and bathroom, add 1 full bath, infill lightwell. | $65,000 |
| Jun 13, 2025 | In progress issued Jun 2026 | 2315 17th Av | comply w/ nov #202033561: add 1 adu per state law. 1/f add 1 bedroom, 1.5 bath, great room & play room. add new deck at rear.Details
comply w/ nov #202033561: add 1 adu per state law. 1/f add 1 bedroom, 1.5 bath, great room & play room. add new deck at rear. | $65,000 |
| Mar 7, 2025 | Completed final sign-off Jun 2025 | 861 Clayton St | unit-1 (unit in back of building): remodel (e) kitchen in kind-replace cabinet, counter top, sink in kind. remodel (e) bathroom in kind- replace sink, toilet, floor tiles in kind. new electrical sub panel, light and outlet. no change to floor layout. no change to wall layout. no structural work.Details
unit-1 (unit in back of building): remodel (e) kitchen in kind-replace cabinet, counter top, sink in kind. remodel (e) bathroom in kind- replace sink, toilet, floor tiles in kind. new electrical sub panel, light and outlet. no change to floor layout. no change to wall layout. no structural work. | $30,000 |