Tupper Construction Corporation
- Based in
- Mill Valley
- On San Francisco permits
- Feb 2007 to Jul 2007
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2007 | Expired or cancelled expired Jun 2009 | 666 Noe St | new header in kitchen area. replae 3" x 8" with 4' x12" beam at 10'6" in kitchen at existing opening.Details
new header in kitchen area. replae 3" x 8" with 4' x12" beam at 10'6" in kitchen at existing opening. | $500 |
| May 21, 2007 | Expired or cancelled expired Jun 2009 | 666 Noe St | one kitchen remodel. non structural, new cabinets, counter top, flooring patch sheetrock in kchn, appliances, lightingDetails
one kitchen remodel. non structural, new cabinets, counter top, flooring patch sheetrock in kchn, appliances, lighting | $40,000 |
| Feb 8, 2007 | Completed final sign-off Aug 2007 | 901 Guerrero St | interior remodel, including kitchen, bathroom, powder room, new lighting & electrical, replace 4 windows with double pain to match existing.Details
interior remodel, including kitchen, bathroom, powder room, new lighting & electrical, replace 4 windows with double pain to match existing. | $85,000 |