Tufo Associates
- Based in
- San Carlos
- On San Francisco permits
- Jun 2003 to Jan 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2018 | Never finaled issued Jan 2018, no final | 25 Stockton St | take out the letter off the blade sign.Details
take out the letter off the blade sign. | $2,000 |
| May 31, 2012 | Completed final sign-off Jul 2012 | 3251 20th Av | space #164, revision to appl #2012.02.28.4957 - corrected structural steel drawing, adding bracing to storefront, detail for pony wall, moving of post.Details
space #164, revision to appl #2012.02.28.4957 - corrected structural steel drawing, adding bracing to storefront, detail for pony wall, moving of post. | $13,000 |
| Feb 28, 2012 | Completed final sign-off Aug 2012 | 3251 20th Av | space 164. tenant fit-out of existing retail store for new tenant- selective demo, new partitions, suspended ceilings, retail store fixtures, plumbing fixtures, hvac, sprinklers. .Details
space 164. tenant fit-out of existing retail store for new tenant- selective demo, new partitions, suspended ceilings, retail store fixtures, plumbing fixtures, hvac, sprinklers. . | $150,000 |
| Feb 17, 2011 | Completed final sign-off May 2012 | 25 Stockton St | minor non structural interior demo, relocate electrical panels, new hvac ducting & new lighting. fire sprinklers, life safety, new electric service on seperate permitDetails
minor non structural interior demo, relocate electrical panels, new hvac ducting & new lighting. fire sprinklers, life safety, new electric service on seperate permit | $225,000 |
| Jun 20, 2003 | Completed final sign-off Jan 2004 | 1390 Market St | t.i. - e. vacant space to converted into a coffee shop. interior alterations w/ outdoor seating.Details
t.i. - e. vacant space to converted into a coffee shop. interior alterations w/ outdoor seating. | $95,000 |