Back to bathroom remodel contractors
Tuck Aire Htg &Air Cond. Corpdba Atlas H
- Based in
- So. San Francisco
- On San Francisco permits
- Jul 2008 to Sep 2023
- Last 24 months
- 0 permits filed
35 permits since 2000: 22 completed, 9 never finaled, 4 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 11 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2016 | Never finaled issued Aug 2016, no final | 690 Market St | install 2 hot chilled water fan coils, ductwork piping. bathroom exhaust fans and ductwork. ref 201606028979. n/a ordinance #155-13Details
install 2 hot chilled water fan coils, ductwork piping. bathroom exhaust fans and ductwork. ref 201606028979. n/a ordinance #155-13 | $38,000 |
| Jan 18, 2013 | Completed final sign-off Aug 2013 | 1980 Vallejo St | install split system heat pump system air handler to be suspeneded from the ceiling of the landry room. 9 supply registers and ductwork as shown. install bath fan vents.Details
install split system heat pump system air handler to be suspeneded from the ceiling of the landry room. 9 supply registers and ductwork as shown. install bath fan vents. | $18,700 |
| Dec 1, 2009 | Completed final sign-off Oct 2010 | 170 Clara St | reference 200902021241, 1 70,000 btu bryant furnace, 1 res hood exhaust fan, 1 dryer vent with boodter fan, 3 bath exhaust fans, 1 5" flue for existing unit heater in garage, 1-5" oval flue for furnace and h20 heaterDetails
reference 200902021241, 1 70,000 btu bryant furnace, 1 res hood exhaust fan, 1 dryer vent with boodter fan, 3 bath exhaust fans, 1 5" flue for existing unit heater in garage, 1-5" oval flue for furnace and h20 heater | $12,780 |
| Oct 13, 2009 | Completed final sign-off Jan 2010 | 2301 Mission St | install 5 furnaces, 2 roof packaged units, ductwork, 11 fire/smoke dampers, 1 supply fan, 1 roof exhaust fan, 5 bathroom fans. ref pa#2009-0722-3207 for t.i.Details
install 5 furnaces, 2 roof packaged units, ductwork, 11 fire/smoke dampers, 1 supply fan, 1 roof exhaust fan, 5 bathroom fans. ref pa#2009-0722-3207 for t.i. | $206,000 |
| Jul 23, 2008 | Expired or cancelled expired Jun 2009 | 2006 Washington St | 3rd floor - install bathroom exhaust fan, duct work, dryer vent, dryer booster fan, rang hood exhaust duct & roof exhaust fan.Details
3rd floor - install bathroom exhaust fan, duct work, dryer vent, dryer booster fan, rang hood exhaust duct & roof exhaust fan. | $15,000 |